What Can I Build on a Sobha Hartland Villa Plot?
Before you brief an architect, know the envelope: height, coverage, roof, style and the extras you can add inside the plot.
A Sobha Hartland villa estate plot allows a G+1 villa with up to 50% ground coverage. The GFA and setbacks are on your plot sheet and affection plan. The roof is for MEP equipment only, with no domes or sloped roofs. The design must be contemporary and minimalist, in line with the villas already built. Inside the plot you can add a pergola, trellis, solar panels, carport, shade structures, a pool house and a gazebo. LPG is not allowed, so the kitchen is electric.
Plot rules
What every villa estate plot allows
These rules come from the Sobha Hartland Development Control Regulations for villa estate plots. Setbacks and the GFA figure are on each plot sheet.
| Rule | Requirement |
|---|---|
| Height | G+1 |
| Ground coverage | Up to 50% of the plot |
| GFA and setbacks | As shown on your plot sheet and affection plan |
| Roof | For MEP equipment only; no domes or sloped roofs |
| Plinth | +300 mm from gate level |
| Windows | Minimum opening height 2.40 m |
| Style | Contemporary and minimalist, in line with the built villas |
| Accessories | Pergola, trellis, solar panels, carport, shade structures, pool house and gazebo within the plot |
| Kitchen | Electrical appliances only; LPG cylinders are not allowed |
| Parking | As per Dubai Municipality; no overnight street parking |
Design brief
What Sobha looks for in the design
| Topic | Expectation |
|---|---|
| Privacy | Limit overlooking into neighbouring villas |
| Heat | Mostly solid envelope, or high specification glass with shading |
| Materials | Stone, concrete, powder coated metal, glass, durable timber finishes |
| Colours | Neutral tones; accents in stone, timber or warm dark grey |
| Lighting | Neutral, concealed facade lighting; no coloured or animated lighting |
| Metals | Brushed or satin finishes; no highly reflective polished metal |
Official sites: Dubai Municipality
What you need to know
- G+1, 50% coverage.
- No domes or sloped roofs.
- Extras inside the plot.
- No LPG.
Documents you will need
- Plot sheet with GFA and setbacks
- Affection plan
- Development Control Regulations
- Your brief
How it works
Starting the design
1. Read
Plot sheet.
2. Brief
Rooms and extras.
3. Massing
Within the rules.
4. Concept
To Sobha.
Questions
What you can build: questions
Can I build a G+2 villa?
No. Villa estate plots are G+1.
Can I use the roof as a terrace?
The roof is for MEP equipment only.
Can I add a pool house or gazebo?
Yes, within the plot limit.
Can I use gas for cooking?
No. LPG cylinders are not allowed; only electrical kitchen appliances.
Where are my setbacks?
On your plot sheet and the Dubai Municipality affection plan.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise. Sobha, Dubai Municipality and service provider fees are separate.
Who can help?
Structural Solutions reads your plot sheet and turns your brief into a design Sobha can approve. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
