Warehouse As-Built Drawings Dubai

We prepare as-built drawings for warehouses in Dubai — including mezzanines, racking, offices and sheds — for change of use, leasing, fit-out applications, regularisation and completion.

We get your drawings for you

No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.

How to get your property drawings →Request online →WhatsApp us
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Why Warehouses Need As-Built Drawings

Warehouses change often: mezzanines are added, offices built, sheds and canopies put up. Before any new application or a lease, the drawings need to show what is really there.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Structure Included

Our survey covers the main structure, mezzanines, racking layouts and steelwork, so the drawings can support structural assessments and permit applications.

Common Projects We Handle

Change of Use

New Tenant Fit-Out

Mezzanine Regularisation

Racking Layout

Leasing or Sale

Completion Certificate

Warehouse As-Built Drawings Dubai at a Glance

StepWhoWhat happens
1Structural engineerDesigns structural changes, mezzanines and racking supports and prepares stamped drawings and calculations.
2Master developer or free zoneIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Civil Defence (DCD)Fire and life safety approval where required.
5Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Lease agreement
  • Master developer or free-zone NOC
  • Layout, racking and equipment details
  • Proposed drawings and stamped structural calculations — prepared by us

Key Technical Rules

  • Free-zone or developer NOC: JAFZA, DIP, Dubai South and other zones approve works first.
  • Authority permit: from the authority for the zone.
  • Civil Defence: fire and life safety approval for the activity.
  • Slab and roof loads: racking, mezzanines and cranes are checked against the structure.
  • Completion inspection: before operation.
Mezzanine Floor Dubai Warehouse Approval

Free-Zone NOC

First approval

Load Check

Slab, roof, racking

Civil Defence

Fire and life safety

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

Warehouse As-Built Drawings Dubai — FAQs

Do warehouses need as-built drawings?

Yes, before new applications, change of use, leasing or regularisation.

Do you include mezzanines and racking?

Yes.

Which areas do you cover?

DM areas, Dubai Investments Park, JAFZA and other industrial areas.

Can the drawings support a permit?

Yes.

Can you assess the structure too?

Yes.