Trakhees · CED

Trakhees Format Villa Extension Drawings Dubai

Trakhees format refers to Trakhees CED's specific drawing layout and documentation standard for villa extension submissions. Structural Solutions prepares documentation to the exact format your developer and authority require for your villa extension submission.

What Is Trakhees Drawing Format for Villa Extensions?

Trakhees CED (Civil Engineering Department) has its own drawing layout, scale, labeling, and documentation requirements for villa extensions in Nakheel-developed communities like Palm Jumeirah, JVC, JVT, Al Furjan, Jumeirah Park, and Jumeirah Islands, distinct from DDA and Dubai Municipality standards.

Site SurveyOur own team
Authority FormatDM, DDA, Trakhees
PDF + DWGReady to submit

What you need to know

  • When Do You Need Trakhees Format Drawings?: Any villa extension submission within a Trakhees-regulated community needs drawings prepared specifically to Trakhees' required format.
  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.
  • PDF and DWG: issued in both formats for submission.

Documents you will need

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

At a glance

Trakhees Format Villa Extension Drawings Dubai at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Surveys the site and prepares drawings to the format of the developer and the authority.—
Nakheel (master developer)
Step 2
Issues the community NOC against its design guidelines.—
Building authority — Trakhees
Step 3
Building permit; work starts only after it is issued.—
Developer and authority
Step 4
Completion inspection and sign-off.—

How it works

Preparation Process

Site Assessment & Existing Structure Review

Drawings Prepared to Required Format

Structural Calculations & Engineering Report

Developer & Authority Portal Submission

Technical Review & Approval

NOC & Building Permit Issued

Who does what

Who does what

🏘️

Master developer

Nakheel, wasl (JGE) or JAFZA, depending on the area. Its NOC comes first.

Trakhees communities →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

What Gets Reviewed

  • Structural Load & Safety Compliance
  • Drawing Format & Documentation Standards
  • Site & Boundary Compliance
  • Registered Engineer Verification
  • GFA / Fee Assessment
  • Inspection & Sign-Off Requirements

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Developer NOC missing
  • Unapproved works already on site
  • Missing owner documents

Questions

Questions owners ask

What is Trakhees drawing format?

Trakhees CED's specific standard for structural drawing layout, scale, and documentation, used across JAFZA and Nakheel-developed communities.

Which communities require Trakhees format drawings?

Palm Jumeirah, JVC, JVT, Al Furjan, Jumeirah Park, Jumeirah Islands, and other Nakheel-developed communities.

Is Trakhees format the same as DDA or DM format?

No. Each authority has its own distinct drawing format and documentation standard.

What happens if drawings aren't in Trakhees format?

The submission is typically rejected or delayed until drawings are reformatted correctly.

Can Structural Solutions prepare drawings in Trakhees format?

Yes. We prepare structural drawings correctly formatted to Trakhees CED's required standard.

Related guides

Keep reading