Trakhees Completion Certificate (BCC) Stuck: What to Do
Your Trakhees completion certificate is stuck on Palm Jumeirah, Jumeirah Park, Al Furjan, JVC, Jebel Ali Village or JAFZA. Here is why it happens and how we close the file.
In Trakhees areas, Nakheel or the master developer inspects the works, Trakhees carries out the final inspection and issues the completion certificate (Trakhees BCC), and Dubai Civil Defence joins where fire safety applies. Nakheel does not issue a final NOC at completion. Files get stuck on as-built drawings, open inspection snags, a contractor no longer registered with Trakhees, missing reports or an expired permit.
Reasons
Why Trakhees completion gets stuck
| Reason | What we do |
|---|---|
| Inspection snags open | Snag list closed with the contractor, re-inspection requested |
| As-built drawings missing or wrong | Survey and correct; see as-built drawings for the completion certificate |
| Contractor no longer valid | The contractor on the file must be registered with Trakhees; see Trakhees contractor change |
| Changes on site | Correct or approve the change |
| Nakheel inspection items | Developer clearance not given |
| Fire safety (warehouses, JAFZA, commercial) | DCD completion pending |
Trakhees areas
Trakhees completion guides by area
| Area | Guide |
|---|---|
| Palm Jumeirah | Palm Jumeirah completion certificate |
| Jumeirah Park | Jumeirah Park completion certificate |
| Al Furjan | Al Furjan completion certificate |
| JVC | JVC completion certificate |
| JAFZA | JAFZA completion certificate |
| Trakhees CED | Trakhees CED completion certificate |
Official sites: Trakhees | Dubai Civil Defence
What you need to know
- Trakhees issues the certificate after its final inspection.
- Nakheel inspects but does not issue a final NOC.
- Contractor on the file must be registered with Trakhees.
- JAFZA and warehouses: Civil Defence too.
Documents you will need
- Trakhees permit number
- Approved drawings and Nakheel NOC
- Inspection snag list
- Owner letter
- Photos of the works
How it works
How we unstick a Trakhees file
1. Status
Where the file stands.
2. Snags
List and fix.
3. As-built
Drawings ready.
4. Contractor
Change if needed.
5. Re-inspection
Trakhees and Nakheel.
6. BCC
Issued.
Already done
Works done without Trakhees approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Trakhees completion questions
Why is my Trakhees completion certificate stuck?
Usually open snags, as-built drawings that do not match the site, a contractor no longer registered with Trakhees, changes on site, or Civil Defence items.
Does Nakheel issue a final NOC at completion?
No. Nakheel inspects the works; Trakhees issues the completion certificate.
What is a Trakhees BCC?
The Building Completion Certificate issued by Trakhees. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
My contractor’s registration expired. Can the file still close?
Yes, usually with a contractor change on the permit. See Trakhees contractor change.
Can you take over a Trakhees completion file?
Yes. See completion certificate takeover service.
How much does it cost?
It depends on the drawings and the scope. We review the file and advise.
Who can help?
Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.