The Pointe Consultant Stamp

Get your structural and fit-out drawings reviewed and stamped by a UAE-licensed consultant for The Pointe submission — prepared to meet the mall's technical requirements.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What a Consultant Stamp Involves

The Pointe requires tenant and fit-out drawings to be reviewed, signed, and stamped by a UAE-licensed structural engineer before work begins. Structural Solutions prepares and stamps structural, architectural, and MEP drawings to meet The Pointe's design and technical submission requirements, alongside any government authority approval your scope of work requires.

Consultant Stamp Process for The Pointe

01

Drawing Preparation

02

Consultant Stamp & Sign-Off

03

Mall Management Submission

04

Authority Review

05

Site Inspection

06

Approval & Sign-Off

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Drawings We Stamp for The Pointe Submissions

Structural Solutions reviews and stamps the full range of drawings mall management teams typically request for tenant fit-out, renovation, and NOC submissions at The Pointe.

Drawing Types We Cover

Structural Drawings Stamp

Architectural Drawings Stamp

MEP Drawings Stamp

Shop Drawings Stamp

As-Built Drawings Stamp

Fit-Out Drawings Stamp

The Pointe Consultant Stamp at a Glance

StepWhoWhat happens
1Structural engineerPrepares the structural design and calculations and stamps them as an authority-registered consultant.
2Master developer (where the community has one)Issues the community NOC against its design guidelines.
3Building authority — Dubai Municipality, DDA or Trakhees — depending on the communityBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Architectural or shop drawings of the element
  • Existing structural drawings, if available

Key Technical Rules

  • Registered engineer: calculations are stamped by an authority-registered consultant.
  • Loads to code: dead, live and wind loads to the applicable codes.
  • Connections designed: fixings, base plates and connections are included.
  • Existing structure checked: where new loads are added to an existing building.
  • Match the drawings: calculations must match the drawings submitted.
Office and retail fit-out approvals in Dubai — Structural Solutions

Stamped Calculations

Registered consultant

Loads to Code

Dead, live and wind

Connections

Fixings designed

Why The Pointe Tenants Choose Structural Solutions

Mall-Ready Submissions

We prepare and stamp drawings in the format mall technical teams expect, reducing back-and-forth.

UAE-Licensed Engineers

Every stamp carries a registered engineer's authority number, valid for mall and government submission.

End-to-End Support

From drawing preparation through mall approval and authority sign-off, handled in one engagement.

Get Your The Pointe Drawings Stamped

Structural Solutions manages the full consultant stamp process for The Pointe — drawing review, stamping, and submission.

The Pointe Consultant Stamp — FAQs

Does The Pointe require a consultant stamp on fit-out drawings?

Yes — The Pointe's management team requires structural (and often architectural or MEP) drawings to carry a UAE-licensed consultant's stamp before approving any tenant fit-out or renovation.

Who provides the consultant stamp for The Pointe submissions?

A UAE-registered structural engineering consultancy, such as Structural Solutions, reviews and stamps your drawings with the engineer's authority registration number.

Do I also need a government authority approval?

In most cases, yes — structural changes typically require Dubai Municipality, DDA, or Trakhees CED approval alongside the mall's own sign-off, depending on the property's jurisdiction.

What do you need from me to get started?

Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works — we confirm the approvals needed and prepare the submission.

Can you stamp drawings prepared by another consultant?

Yes — we can review and stamp third-party drawings, or prepare them from scratch, depending on what you need.