Splitting a Large Store Into Smaller Units
When a department store or supermarket leaves, malls and retail centres often divide the space into several smaller units. These are bigger jobs, led by the owner or leasing team.
Splitting a large store into smaller units in Dubai needs a full redesign of the space: new partition walls with fire separation, a corridor or new frontages so each unit has its own entrance, exits within the travel distance, and separate services for each unit. The mall or centre owner leads it. The authority for the area approves the works (Dubai Municipality, DDA or Trakhees) and Civil Defence approves the fire layout. We design the subdivision for the owner and handle the approvals.
Design
What a large store subdivision needs
| Item | What we design |
|---|---|
| Layout of the new units | Sizes the leasing team can let |
| Access | New mall frontages or a service corridor |
| Exits | Each unit within the travel distance |
| Fire separation | Rated walls between the units |
| Services | Power, AC, sprinklers and alarm per unit |
| Structure | Checks for new openings in the frontage |
Phasing
Building it in phases
| Approach | When it helps |
|---|---|
| Shell units first | Tenants fit out their own unit later |
| Phase by phase | When parts are already let |
| One go | When the whole space is empty |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence
What you need to know
- Owner leads.
- Access for every unit.
- DCD approves.
- Phasing possible.
Documents you will need
- Existing store drawings
- Leasing plan or target unit sizes
- Mall or centre services drawings
- Photos
How it works
From one big store to many units
1. Brief
Unit sizes.
2. Survey
Structure, services.
3. Design
Layout and fire.
4. Approvals
Authority, DCD.
5. Works
Shell units.
6. Tenants
Fit-outs.
Questions
Large store split: questions
Can a department store space be split into several shops?
Yes, with a new layout that gives each unit its own access, exits and services.
Who applies for the approvals?
The mall or centre owner, through its consultant. We do this for owners.
Do the new tenants need their own approvals?
Yes, each fit-out is approved separately.
What if only one tenant wants to split their unit?
What does a subdivision cost?
Our fee depends on the drawings and the scope; we review and advise. The works, the developer or mall fees and the authority fees are separate, and we list them for your unit before you commit.
Who can help?
Structural Solutions designs large store subdivisions for mall and centre owners. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
