Can a Mall Tenant Downsize or Split a Leased Unit?
Brands cutting space often want to keep the front of a unit and hand back the rest. That is a split, and the mall leads it.
A mall tenant can ask to downsize by splitting the leased unit, keeping one part and returning the other to the mall. The mall management decides, usually as part of a lease change. If it agrees, the split is designed so both parts work as separate units, the mall approves the drawings, Civil Defence approves the fire layout and the authority for the mall area approves the works. Who pays for the works is agreed with the mall. We prepare the drawings and handle the approvals.
Downsizing
What to agree with the mall
| Topic | Agree before design |
|---|---|
| Which part you keep | Usually the frontage |
| Who pays for the works | Tenant, mall or shared |
| Handover condition | State of the returned part |
| Timing | Works while trading or closed |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence
What you need to know
- Mall leads.
- Lease change.
- Both parts must work.
- DCD approves.
Documents you will need
- Lease
- Unit plan
- Which part you keep
- Mall contact
How it works
Downsizing a mall unit
1. Ask
Mall.
2. Agree
Terms.
3. Design
Two units.
4. Approvals
Mall, DCD.
5. Authority
By mall.
6. Works
Split built.
Questions
Downsizing a mall unit: questions
Can I hand back part of my mall unit?
Only if the mall agrees. It is usually done as a lease change.
Who designs the split?
Usually the tenant consultant, approved by the mall. We prepare the drawings.
Does Civil Defence need to approve?
Yes, both new units need their own fire layout. See Civil Defence approval for a unit split.
Is it the same as splitting to sublet?
No; subletting needs separate mall consent. See splitting a mall shop into two units.
What does it cost?
Our fee depends on the drawings and the scope; we review and advise. The works, the developer or mall fees and the authority fees are separate, and we list them for your unit before you commit.
Who can help?
Structural Solutions prepares downsizing drawings for mall tenants and handles the approvals. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
