Sobha Hartland · Submission · Updated November 2026

Sobha Hartland Plot Design Submission: Drawings and Documents

A complete submission avoids rounds of comments. This is the list Sobha asks for on a villa estate plot.

For a Sobha Hartland villa plot, the design submission includes the consultant appointment letter, site and setting out plan, floor plans for every level, roof plan, sections and elevations, 3D perspective views, boundary wall design, interface design with the public realm and roads, and area, parking and utility calculations. It also needs a letter of undertaking that the utility loads are within the allocated limits and confirmation that the plot entry and exit follow the allocated access.

Soft copyPDF and CAD
Hard copyOne set
PlusTwo undertakings

Checklist

The submission list

ItemNote
Consultant appointment letterSigned by the owner
Site and setting out planWith setbacks
Floor plansAll levels
Roof planMEP equipment and screening
Sections and elevationsHeights and plinth
3D perspective viewsMassing and materials
Boundary wall designTo the plot sections
Public realm and road interfaceDriveway and service outlets
Area, parking and utility calculationsGFA, coverage, loads
Utility load undertakingWithin the allocated limits
Access confirmationEntry and exit as allocated

Official sites: Dubai Municipality

What you need to know

  • 11 items.
  • PDF, CAD and hard copy.
  • Title block on every sheet.
  • Plot number on all letters.

Documents you will need

  • Plot sheet
  • Affection plan
  • Infrastructure layout
  • Owner details

How it works

Preparing the submission

1. Collect

Plot documents.

2. Draw

Full set.

3. Check

Against the rules.

4. Submit

To Sobha.

Questions

Submission: questions

What must the title block show?

The owner, all consultants, the master developer name and logo, signature or stamp, scale, and revision and date.

Do I quote the plot number?

Yes, the developer plot number goes on all correspondence with Sobha.

Do I need 3D views?

Yes, perspective views are part of the list.

What about the boundary wall?

Its design is part of the submission and follows the plot wall sections.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise. Sobha, Dubai Municipality and service provider fees are separate.

Who can help?

Structural Solutions prepares the full Sobha submission set. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading