Sobha Hartland · Stage 1 · Updated November 2026

Sobha Hartland Concept Design NOC for a Villa Plot

The Concept Design NOC is the first approval on a Sobha Hartland villa plot. Without it, you cannot apply to Dubai Municipality.

The Concept Design NOC is issued by Sobha after it reviews your concept design report against the Development Control Regulations. The report includes the consultant appointment letter, site and setting out plan, floor plans, roof plan, sections, elevations, 3D views, boundary wall design and area, parking and utility calculations. With the NOC, your consultant applies for the Dubai Municipality preliminary approval.

Issued bySobha
UnlocksDM preliminary approval
FormatPDF, CAD and one hard copy

Checks

What Sobha checks at concept stage

CheckAgainst
Height and coverageG+1, up to 50%
Setbacks and GFAYour plot sheet
RoofMEP only, no domes or sloped roofs
StyleContemporary, minimalist
AccessPlot entry and exit as allocated
UtilitiesWithin the allocated loads

Official sites: Dubai Municipality

What you need to know

  • First approval.
  • Sobha issues it.
  • Unlocks DM preliminary.
  • Comments are common.

Documents you will need

  • Consultant appointment letter
  • Concept drawings and 3D views
  • Area, parking and utility calculations
  • Plot sheet

How it works

Getting the concept NOC

1. Brief

Your rooms.

2. Concept

Drawings and report.

3. Submit

To Sobha.

4. NOC

Concept Design NOC.

Questions

Concept design NOC: questions

Can I apply to Dubai Municipality before the Concept Design NOC?

No. Sobha approval comes first.

What format does Sobha want?

Soft copy in PDF and CAD, plus one hard copy.

What must each drawing show?

A title block with the owner, the consultants and the master developer name and logo, an authorised signature or stamp, the scale, and the revision and date.

What comes next?

See the detailed design NOC.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise. Sobha, Dubai Municipality and service provider fees are separate.

Who can help?

Structural Solutions prepares the concept design report and gets the Sobha Concept Design NOC. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading