Palm Jumeirah · Shoreline · Updated November 2026

Merging Two Apartments in Shoreline, Palm Jumeirah

Owners of two neighbouring Shoreline units often want one larger home. Merging is possible, with more approvals than a normal fit-out.

To merge two apartments in the Shoreline Apartments, a structural engineer checks the separating wall or slab, then the design shows the new layout, MEP and fire safety. The Nakheel NOC comes first, followed by the Trakhees permit and Civil Defence approval for the fire systems and exits. After the works and the Trakhees completion, the title deed is updated to show one unit. We handle the full file.

NOCNakheel
PermitTrakhees, plus Civil Defence
EndTitle deed update

Steps

The merging route

StepWho
Structural check of the separating wall or slabStructural Solutions
Design: layout, MEP, fire safetyStructural Solutions
NOCNakheel
PermitTrakhees
Fire safetyCivil Defence
Works and completionContractor, Trakhees
Title deed updateDubai Land Department

Official sites: Trakhees | Dubai Civil Defence

What you need to know

  • Structural check first.
  • Civil Defence applies.
  • Trakhees permit.
  • Title deed updated.

Documents you will need

  • Both title deeds
  • Owner ID
  • Layouts of both units
  • Photos

How it works

Merging, step by step

1. Check

Wall or slab.

2. Design

Full set.

3. NOC

Nakheel.

4. Permit

Trakhees, DCD.

5. Works

And completion.

6. Deed

One unit.

Already done

Works already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

Merging: questions

Can I merge two Shoreline apartments?

Yes, with the Nakheel NOC, a Trakhees permit and Civil Defence approval.

Do both units need the same owner?

Yes, both units should be in the same name.

Is the title deed changed?

Yes, after completion the deed is updated to one unit.

Do I need a structural engineer?

Yes. See structural engineer for merging.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise. Nakheel and Trakhees fees are separate.

Who can help?

Structural Solutions handles Shoreline apartment merging from the structural check to the title deed. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading