RTA Street Furniture Relocation: Moving Signs, Signals, Barriers or Bus Stops
Road signs, traffic signals, barriers and bus stops in the road reserve belong to RTA. If one is in the way of your works or new access, RTA must approve moving it first.
The short answer
Road signs, traffic signals, barriers, bus stops and similar fixtures in the public road reserve are RTA assets. If one sits where your new driveway, access or works will go, it can only be moved with RTA approval, before the works. The application shows the existing position, the proposed new position and why it must move, as part of the access or works drawings. Street light poles follow their own relocation route.
What you need to know
- Fixtures: Signs, signals, barriers, bus stops.
- Drawings: Existing and new positions.
- Reason: Usually a new access or works in the road reserve.
- Light poles: See the street light relocation page.
Documents you will need
- Affection plan showing the plot and the road reserve
- Site layout showing where the works enter the road reserve
- Drawings of the works: plans, sections and details
- Traffic management or diversion layout where the road or footpath is affected
- Stamped structural calculations where something is built or lifted
- Contractor details
By type of work
Fixtures and where to start
We confirm which RTA approval your works need.
| Fixture | Approval route | Guides |
|---|---|---|
| Road sign or barrier RTA relocation approval | With the works drawings. | — |
| Bus stop RTA relocation approval | With the access drawings. | — |
| Street light pole Light pole relocation | Own route. | Street lights |
| New driveway Access permit | Fixtures in the way. | Driveway NOC |
How it works
How the RTA NOC works
1. Site check
Are the works inside the road reserve? Checked against the affection plan.
2. Drawings
Layout, sections and details of the works in the road reserve.
3. Calculations
Stamped structural calculations where needed.
4. Traffic layout
Diversion, lane or footpath closure layout if the road is affected.
5. RTA NOC
Application to RTA; comments answered.
6. Works
Only inside the approved area, after the NOC.
7. Reinstatement
The road, kerb or footpath is reinstated as approved.
Who does what
Who is involved
RTA (Roads and Transport Authority)
Issues the right-of-way (ROW) NOC for works inside the public road reserve.
What is a ROW NOC? →Traffic management
Where a lane, road or footpath is affected, the diversion or closure layout is approved too.
Lane closures →Structural Solutions
Prepares the drawings, layouts and stamped calculations for the RTA application.
Talk to our engineers →What we prepare
- Relocation drawings
- Access drawings
Why RTA applications get returned
- Works shown outside the approved area
- No traffic management layout where lanes or footpaths are affected
- Drawings that do not match the site
- Missing structural calculations
- Works started before the NOC
Questions
Questions owners and contractors ask
Can I move a road sign in front of my plot?
Only with RTA approval, before the works.
Who owns bus stops and signals?
RTA.
What about a light pole?
It follows the street light relocation route.