RTA Parking Reservation for Construction Works in Dubai

When a crane, concrete pump or delivery trucks need to stand on public parking bays, or the bays are needed for a temporary site access, they must be reserved first: RTA approves, then Parkin reserves the bays.

Public parking bays next to a construction site can only be used for the works with approval. The RTA approves the use of the bays for the construction activity, and Parkin then reserves and blocks the bays for the works. It is needed when a crane, concrete pump or delivery trucks stand on the parking bays, or when bays are blocked to create a temporary site access. We prepare the layout drawing showing the bays, the crane or truck position and the access, and handle the applications for the contractor or owner.

ApprovesRTA
Reserves the baysParkin
Needed forCranes, trucks, site access
We handleLayout and applications

What you need to know

  • RTA first: The use of the bays for the works is approved by RTA.
  • Then Parkin: Parkin reserves and blocks the approved bays.
  • Cranes and pumps: The crane or pump position and outriggers are shown on the layout.
  • Trucks: Delivery trucks standing on the bays need the bays reserved.
  • Site access: Bays blocked for a temporary site entrance are shown on the drawing.
  • Not without approval: Using the bays without approval can lead to violations.

Documents you will need

  • Trade licence of the contractor
  • Building permit or project details
  • Site plan showing the parking bays to be used
  • Crane, pump or truck position, where relevant
  • Temporary site access layout, where relevant

By situation

When you need a parking reservation

We confirm the requirements for your project.

ActivityApproval routeGuides
Crane or concrete pump on the bays
RTA approval, then Parkin
Position and outriggers shown.RTA crane permit
Delivery trucks on the bays
RTA approval, then Parkin
Trucks standing while unloading.Truck permit
Temporary site access over the bays
RTA approval, then Parkin
Access shown on the layout.Vehicle access
Works also closing a lane
Plus a road closure permit
Diversion layout needed.Road closure permit

How it works

How we get the bays reserved

1. Site check

Which bays are needed and for what.

2. Layout drawing

Bays, crane or truck position and access.

3. RTA application

Approval of the use of the bays.

4. Parkin

Bays reserved and blocked after the RTA approval.

5. Works

Carried out on the reserved bays only.

Who does what

Who approves it

🛣️

RTA

Approves the use of the public parking bays for the construction works.

RTA approvals →
🅿️

Parkin

After the RTA approval, Parkin reserves and blocks the parking bays for the works.

Parking reservation →
📐

Structural Solutions

Prepares the layout drawing of the bays, the crane or truck position and the site access, and handles the applications.

Talk to our engineers →

Why applications come back

  • Bays not shown clearly on the layout
  • Crane or truck position missing
  • Access across the footpath not shown
  • Lane closure needed but not applied for

Questions

Questions contractors ask

Who reserves public parking bays for construction in Dubai?

RTA approves the use of the bays, then Parkin reserves and blocks them.

When do I need to reserve parking bays?

When a crane, concrete pump or trucks stand on the bays, or the bays are used for a temporary site access.

Can I just put cones on the bays?

No, the bays must be approved and reserved first.

Who applies?

We prepare the layout and handle the applications for the contractor or owner.

What if the works also close a lane?

A road closure permit with a diversion layout is needed as well.