RTA External Paving & Interlock Permit Dubai
External paving and interlock laid outside your plot limit — driveway aprons, verges and footpaths — is in the RTA road reserve and needs RTA approval, and where applicable the developer’s NOC.
Inside or Outside the Plot
Paving inside the plot limit is private. Outside it, the paving belongs to the road reserve and is approved through the access design, construction NOC and sidewalk modification permit.
What you need to know
- Order of approvals: RTA access design study → developer plot access NOC → RTA construction NOC → sidewalk modification permit.
- DLTM drawings: Developers such as Nakheel return drawings that are not PDF plus AutoCAD DLTM.
- Outside the plot limit: Kerb, verge and interlock works are in the road reserve.
- No early works: Concept approval alone does not allow works on site.
- Deposit refund: After the works are inspected and accepted.
Documents you will need
- Title deed and affection plan
- Owner passport and Emirates ID copy
- Survey-based drawings in PDF and AutoCAD DLTM
- RTA-approved access design (for the developer NOC)
At a glance
RTA External Paving & Interlock Permit Dubai at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Surveys the plot and prepares access, kerb and interlock drawings in PDF and AutoCAD DLTM. | — |
| RTA Step 2 | Access design study (concept approval). | — |
| Master developer Step 3 | Plot access, curb cut and interlock NOC where the community has one. | — |
| RTA Step 4 | Construction NOC, then the sidewalk modification permit. | — |
| RTA and developer Step 5 | Inspection after works and security deposit refund. | — |
How it works
How We Get Your Plot Access Approved
Site Survey & Plot Limits (DLTM)
RTA Access Design Study
Developer Plot Access NOC
RTA Construction NOC
RTA Sidewalk Modification Permit
Works, Handover & Deposit Refund
Who does what
Who approves access works
RTA
Reviews the Access Design Study, then issues the Construction NOC and the Sidewalk Modification Permit, and inspects the works.
RTA approvals →Master developer
In communities such as Nakheel, Emaar or Dubai Holding areas, its plot access NOC comes before the RTA permit.
Developer NOC first →Structural Solutions
Surveys the site, prepares the DLTM drawings and handles the applications for you.
Talk to our engineers →Projects We Handle
- Driveway Apron
- Verge Paving
- Footpath Interlock
- Gate Area Paving
- Compound Access Paving
- Paving Replacement
Why applications come back
- Drawings not in AutoCAD DLTM coordinates
- Works outside the plot limit not shown against a site survey
- Developer plot access NOC missing in a master community
- Works started on concept approval only
- Kerb and footpath reinstatement not detailed
Questions
Questions owners ask
Do I need RTA approval for interlock outside my plot?
Yes — it is in the road reserve and needs RTA approval and a sidewalk modification permit.
Do you design the paving?
Yes — build-up, levels and tie-in details on survey-based DLTM drawings.
Do you prepare the access drawings?
Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.
Can works start before all approvals?
No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.
Related guides