Palm Jumeirah Villa As-Built Drawings

We prepare as-built drawings for Palm Jumeirah villas, showing the villa exactly as it stands today. They are needed when original drawings are missing, after past modifications, before new Nakheel NOC or Trakhees applications, and before selling.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Why Palm Jumeirah Owners Need As-Built Drawings

Many Palm Jumeirah villas have been changed since handover — extensions, enclosed areas, removed walls, pools and pergolas. New applications to Nakheel and Trakhees need drawings that match what is actually on site, so the starting point is an accurate as-built set.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Drawn to Trakhees Requirements

Building permits in Palm Jumeirah are handled by Trakhees, after the Nakheel NOC. We prepare the as-built drawings in AutoCAD to Trakhees CED format, so they can be used directly for the next application.

When Palm Jumeirah Owners Call Us

Original Drawings Missing

Before a New Extension

After Unapproved Works

Before Selling the Villa

For Regularisation

For Completion Certificate

Palm Jumeirah Villa As-Built Drawings at a Glance

StepWhoWhat happens
1Structural engineerSurveys the site and prepares drawings to the format of the developer and the authority.
2Nakheel (master developer)Issues the community NOC against its design guidelines.
3Building authority — TrakheesBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

Key Technical Rules

  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.
  • PDF and DWG: issued in both formats for submission.
As-built drawings and measured survey in Dubai — Structural Solutions

Site Survey

Our own team

Authority Format

DM, DDA, Trakhees

PDF + DWG

Ready to submit

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

Palm Jumeirah Villa As-Built Drawings — FAQs

Do I need as-built drawings for my Palm Jumeirah villa?

If the original drawings are missing or the villa has been modified, yes — before new applications or a sale.

Who reviews drawings in Palm Jumeirah?

Nakheel for the NOC, then Trakhees for building permits.

What format are the drawings in?

AutoCAD, prepared to Trakhees CED format.

Do you visit the villa?

Yes, we carry out a measured survey on site.

Can the drawings be used for a new application?

Yes, they are prepared as the base for your next submission.