Structural Design for a New Villa in Dubai
Building a villa on a plot? The structural design sets the foundations, frame and slabs, and it is a core part of the authority approval.
The structural design of a new villa in Dubai starts with the soil investigation. Our structural engineers design the foundations, columns, beams, slabs, stairs, roof and any basement and shoring, coordinate with the architecture and MEP, and prepare the stamped calculations and structural drawings for the master developer and the authority. During construction we inspect the reinforcement before each pour and support the completion certificate.
Design scope
What the structural design covers
| Element | What we design |
|---|---|
| Foundations | Isolated, strip or raft footings from the soil report |
| Basement and shoring | Retaining walls and temporary shoring inside the plot |
| Frame | Columns, beams and shear walls |
| Slabs | Floors, roof and terraces |
| Stairs and lift | Stair flights, lift shaft and pit |
| Pool and boundary wall | Pool shell and wall foundations |
Plot communities
New villa guides by community
| Community | Guide |
|---|---|
| Jebel Ali Hills | Jebel Ali Hills villa approvals |
| Sobha Hartland | Sobha Hartland villa plots |
| Any plot | empty plot: what can I build? |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence | Dubai Building Code
What you need to know
- Stamped calculations.
- Approval handled for you.
- Dubai only.
- One team from design to sign-off.
Documents you will need
- Affection plan and plot rules
- Soil investigation report
- Architectural drawings
- Developer design guidelines
How it works
From soil report to completion
1. Soil
Investigation.
2. Scheme
Structural system.
3. Design
Calculations.
4. Drawings
Stamped.
5. Approve
Developer, authority.
6. Inspect
Before pours.
Questions
New villa design: questions
Do I need a soil investigation?
Yes, the foundation design depends on it.
Can you work with my architect?
Yes, we coordinate the structure with the architecture and MEP.
Do you inspect during construction?
Yes, before each concrete pour and at the key stages. See site supervision.
Who approves the design?
The master developer and the authority for the plot.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions designs the structure of new villas and takes it through approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.