Nakheel · Nakheel communities

Unapproved Exterior Colour on a Nakheel VSR

An exterior colour that Nakheel did not approve can show up in the Villa Status Report (VSR). It needs to be fixed before a sale, usually by repainting in the approved colour with a Nakheel NOC.

The short answer

Exterior painting in Nakheel communities needs a Nakheel NOC and a Trakhees permit. Nakheel usually asks owners to match the existing colour and provides the colour code. A colour that was not approved can show up in the VSR and needs to be fixed before a sale, usually by repainting in the approved colour.

Developer NOCNakheel NOC
Building permitTrakhees
Submitted byAn approved consultant

What you need to know

  • Colour code: Nakheel provides the colour code for the villa.
  • Scaffolding: Approved by Trakhees, and by the RTA as well if it stands on the road.
  • Interior: Interior painting needs no NOC.
  • Before a sale: Unapproved works on the VSR need fixing before a sale.

Documents you will need

  • Title deed and owner Emirates ID or passport
  • Villa plans from Nakheel, or as-built drawings
  • Proposed drawings
  • Stamped structural calculations for structural works
  • Photos of the area

At a glance

Unapproved Exterior Colour on a Nakheel VSR at a glance

Who does what, step by step.

WhoApproval routeGuides
Owner and us
Step 1
Get the VSR and the colour code from Nakheel.—
Nakheel
Step 2
Reviews the drawings and issues the NOC.—
Trakhees
Step 3
Permit, including scaffolding, plus RTA approval if it stands on the road.—
Nakheel and Trakhees
Step 4
Inspection and completion.—

How it works

How it works

Get the VSR and colour code

Apply for the Nakheel NOC

Trakhees permit and scaffolding approval

Repaint in the approved colour

Re-inspection

Who does what

Three parties, one route

🏘️

Nakheel

Master developer. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

Exterior works that need a NOC

  • Repainting the façade
  • Boundary walls and gates
  • Window frames and doors

Why applications come back

  • Drawings that do not match the villa as it stands
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

Can an unapproved colour stop my villa sale?

Unapproved works on the VSR need to be fixed before a sale, and that includes an unapproved exterior colour.

Do I need a NOC to repaint in the approved colour?

Exterior painting needs a Nakheel NOC and a Trakhees permit, even when repainting.

Where do I get the approved colour?

Nakheel provides the colour code.

Does interior painting need approval?

No. Interior painting needs no NOC.

Related guides

Keep reading