Nakheel Signage NOC
In buildings and communities managed by Nakheel, your sign needs Nakheel’s approval — a signage NOC — before the authority signage permit. We prepare the drawings to their design rules and handle the submission.
What the NOC Checks
The sign’s size, position, materials, colours, illumination and fixing, against Nakheel’s signage and facade rules for the building or community.
What you need to know
- After the NOC: With the NOC issued, the signage permit is obtained from the authority for the area. Larger signs also need engineer-stamped structural calculations.
- NOC first: the landlord, mall or developer approves the sign before the authority permit.
- Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
- Size and position rules: set by the building and the authority for the area.
- Electrical safety: illuminated signs need safe electrical details.
- Permit before installation: signs go up only after approval.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Landlord, mall or developer NOC
- Sign design with size, materials and position
- Photos of the facade or location
At a glance
Nakheel Signage NOC at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Prepares the sign drawings and, for larger signs, the stamped structural calculations. | — |
| Landlord, mall or master developer Step 2 | Issues the NOC for the works. | — |
| Authority — Dubai Municipality, DDA or Trakhees — depending on the community Step 3 | Reviews the drawings and issues the permit. | — |
| Landlord and authority Step 4 | Completion inspection. | — |
How it works
How We Get Your Signage Approved
Sign Design, Size & Location Reviewed
Landlord, Mall or Developer NOC
Structural Check Where Needed
Engineer-Stamped Drawings & Calculations
Authority Signage Permit
Installation & Inspection
Who does what
Three parties, one route
Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →Projects We Handle
- Retail Unit Sign
- Office Sign
- Restaurant Sign
- Facade Sign
- Rebranding
- New Tenant Sign
Why applications come back
- Drawings that do not match the villa as it stands
- AutoCAD in DLTM coordinates not supplied where asked
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
Do I need Nakheel’s approval for my sign?
Yes, in properties they manage, before the authority permit.
What do they check?
Size, position, materials, illumination and fixing against their rules.
Can I install the sign before approval?
No — install only after the landlord or mall approval and the signage permit are issued.
Do you prepare the sign drawings?
Yes — elevations, materials and fixing details, stamped where required.
Can you work with my sign company?
Yes — we provide structural calculations, stamped drawings and approval support for sign makers.