Maple Townhouse Garage Door and Side Openings

A Maple townhouse garage door must be automated and folding, and the garage stays parking. Side openings can be blocked, but the front cannot.

A Maple townhouse garage door must be an automated, folding, rectangular panel door with no windows, in traffic white (RAL 9016), white aluminum (RAL 9006), light ivory (RAL 1015) or oyster white (RAL 1013). Roller shutters and manual doors are not allowed. The garage must stay as car parking. Where a unit has an opening on the side of the garage, it can be blocked with block work, fixed windows or doors, or aluminum louvers that match the townhouse. The front of the garage cannot be blocked, and bins and DEWA meters must stay accessible. The garage roof cannot be changed.

DoorAutomated folding
UseCar parking only
Side openingsCan be blocked

Emaar’s guide

Garage rules in Maple

From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.

ItemWhat the guide says
Door typeAutomated folding rectangular panels, no windows
ColoursRAL 9016, RAL 9006, RAL 1015 or RAL 1013
Not allowedRoller shutters and manual doors
UseCar parking only
Side openingsBlock work with plaster and paint, fixed windows or doors, or matching aluminum louvers
FrontCannot be blocked
RoofNo modifications

Official sites: Emaar · Dubai Development Authority

Maple townhouse garage door and opening rules

  • Roller shutters: Not allowed, because of noise.
  • Change of use: Not allowed.
  • Services: Bins and DEWA meters must not be blocked.
  • Roof: No changes to the garage roof.

Documents you will need

  • Title deed and owner ID
  • Existing and proposed drawings and elevations
  • Detailed scope of works
  • Photos of the townhouse
  • Contractor or consultant licence
  • Building Completion Certificate

How it works

From idea to approval in Maple

1. Check

We check your idea against Emaar’s Maple guide and your plot.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved.

6. Completion

Emaar and DDA inspections, and the completion certificate.

Who does what

Who is involved

📐

Structural Solutions

Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.

Maple townhouse rules →
🏘️

Emaar

Reviews the design and issues the NOC.

Emaar approvals →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works, after the Emaar NOC.

DDA approvals →

Why applications come back

  • Design does not follow Emaar’s Maple guide
  • Materials or colours do not match the townhouse
  • Neighbour NOC missing where it is needed
  • Works started before the NOC

Questions

Questions people ask

What garage door can I install?

An automated, folding, rectangular panel door with no windows, in one of the listed colours.

Can I use a roller shutter?

No, roller shutters and manual doors are not allowed.

Can I turn the garage into a room?

No, it must stay as car parking.

Can I block the side opening?

Yes, following the conditions in Emaar’s guide.