Kitchen Ventilation and Odour Control in Dubai
Cooking smells reaching neighbours or offices above is one of the most common building management complaints about restaurants.
A commercial kitchen in Dubai needs an exhaust hood over the cooking line, ductwork to a discharge point and fresh air to replace what is extracted. The exhaust and its fire suppression are approved by Civil Defence (DCD), and the building management decides where the exhaust can discharge, often with odour control where it is close to windows or terraces. The duct route can need openings in slabs, walls or the roof, which we check structurally. We design the ventilation route, coordinate it with the landlord and include it in the food layout and DCD submissions.
On the drawings
What the layout shows
DM Food Safety reviews these on the drawings and again at the inspection. We design them for your layout and menu.
| Item | What we show |
|---|---|
| Exhaust hood | Over the cooking line |
| Duct route | To roof or facade discharge |
| Fresh air | Replacing extracted air |
| Odour control | Where discharge is near windows or terraces |
| Fire suppression | kitchen exhaust and DCD |
| Slab and wall openings | the structural assessment |
Where it fits
Where this sits in the food approval
| Step | Who | Guide |
|---|---|---|
| NOC | Landlord, building management or mall | the fit-out NOC |
| Kitchen layout | DM Food Safety | kitchen layout approval |
| Fit-out permit | Dubai Municipality | DM approvals |
| Exhaust and fire safety | DCD | kitchen exhaust and DCD |
| Inspection before opening | DM Food Safety | the inspection before opening |
Official sites: Dubai Municipality
What you need to know
- Hood and ducts designed.
- DCD approves exhaust.
- Landlord decides discharge.
- Openings checked.
Documents you will need
- Trade licence or initial approval
- Landlord or mall NOC
- Menu and equipment list
- Unit plan or existing drawings
How it works
How we design it
1. Brief
Menu, equipment.
2. Layout
Zones.
3. Detail
This item.
4. Submit
DM Food Safety.
5. Fix
Comments.
6. Inspect
Before opening.
Questions
Kitchen Ventilation and Odour Control in Dubai: questions
Who approves kitchen exhaust in Dubai?
DCD approves the exhaust and fire suppression; the building management decides the discharge point. See kitchen exhaust and DCD.
Do I need odour control?
Often where the discharge is near windows, terraces or offices. The building management may ask for it.
Can the exhaust go through the slab above?
Only with approval from the building management and a structural check of the opening.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions designs food premises layouts and gets DM Food Safety approval in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
