Before opening · Inspection

What Does the Dubai Municipality Food Inspection Check Before Opening?

The last step before your food business opens.

After the approvals and the fit-out, Dubai Municipality inspects the unit before opening. It checks that what is built matches the approved food layout: the areas, the equipment and how food moves through the unit. Then the food safety remark on the trade licence is removed. We prepare you for it by checking the unit against the approved drawings first.

What we prepare

  • Layout: Built as approved
  • Equipment: In approved positions
  • Areas: Used as approved
  • Changes: None unapproved
  • Remark: Removed after
  • Records: Approval on file

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or title deed
  • Landlord, building or mall NOC (or we request it with you)
  • Your activity, menu and equipment list
  • Existing drawings, if available

Route

From approval to opening

The general route. We confirm it for your unit and area.

StepApproval routeGuides
Approvals
DM Food Safety, authority, DCD
Food layout, fit-out permit and fire approval in place.Food layout approval
Fit-out
Contractor
Built to the approved drawings.—
Our check
Structural Solutions
Unit checked against the approved layout.—
Inspection
Dubai Municipality
Built against approved.—
Remark removed
Dubai Municipality
The food safety remark on the trade licence.Licence remark
Open
You
Keep the layout as approved; changes need a new approval.—

How it works

How we get it approved

1. Send us the details

Area, unit, business and what you serve.

2. Site check

We measure the unit and check the services.

3. Drawings

Food layout and fit-out drawings.

4. Submission

DM Food Safety, the area authority and DCD, by us.

5. Comments

We answer them until approval.

6. Inspection

Before opening, then the licence remark is removed.

What causes problems

  • Built differently from the approved layout
  • Equipment moved after approval
  • Opening before the inspection

Opening a food business?

Get your food layout approved

Send us three things on WhatsApp:

  1. Area, building and unit
  2. Your activity and menu
  3. Photos or existing drawings

We prepare the drawings and handle DM Food Safety, the fit-out permit and DCD.

Questions

Questions

When is the inspection?

After the approvals and the fit-out, before opening.

What happens after it?

The food safety remark on the trade licence is removed.

Can you check the unit before?

Yes, against the approved drawings.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading