Jebel Ali Village As-Built Drawings

Need as-built drawings for your completed Jebel Ali Village project? Get accurate documentation prepared for Trakhees final sign-off.

What Are As-Built Drawings and Why Are They Needed?

As-built drawings document exactly how your Jebel Ali Village villa was constructed, reflecting any changes made on-site during the build compared to the originally approved drawings. Trakhees typically requires these before issuing final completion sign-off. We survey the completed work and prepare accurate as-built documentation for submission.

Authority FormatDM, DDA, Trakhees

What you need to know

  • Trakhees Approvals We Handle in Jebel Ali Village: As-built drawing services we provide for Jebel Ali Village projects.
  • Ready to Start Your Jebel Ali Village Approval?: Speak with our structural engineering team today and get a clear scope, timeline, and fixed quote for your project.
  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.

Documents you will need

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

At a glance

Jebel Ali Village As-Built Drawings at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Surveys the site and prepares drawings to the format of the developer and the authority.—
Master developer (where the community has one)
Step 2
Issues the community NOC against its design guidelines.—
Building authority — Trakhees
Step 3
Building permit; work starts only after it is issued.—
Developer and authority
Step 4
Completion inspection and sign-off.—

How it works

How We Handle Your Jebel Ali Village Approval

We inspect your villa and confirm exactly what documentation and approvals your work needs before anything is submitted.

Our engineers prepare structural drawings and calculations in Trakhees format, stamped and ready for submission.

We submit your application and drawings to Trakhees on your behalf and track it through review.

If Trakhees raises a comment or requests a revision, we handle it directly so your approval doesn't stall.

Once approved, you receive your NOC or permit ready to hand to your contractor or building management.

We stay available through construction for inspections, as-built drawings, or final sign-off if your approval requires it.

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Jebel Ali Village. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

Approval Types

  • Post-Construction As-Built Survey
  • Extension As-Built Drawings
  • Renovation As-Built Drawings
  • Full Villa As-Built Set
  • As-Built for Unpermitted Works
  • As-Built for Resale/Handover

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

Why do I need as-built drawings if I already have approved drawings?

Construction often deviates slightly from the original plan. As-built drawings capture what was actually built, which Trakhees needs for final sign-off.

When should as-built drawings be prepared?

Right after construction is complete, before requesting Trakhees' final inspection and completion certificate.

Can as-built drawings help if I want to sell my villa?

Yes, buyers and their consultants often ask for as-built drawings to confirm the property's structure matches approved records.

What if the as-built work doesn't match my original approval?

We flag any discrepancies and advise whether a retroactive approval or minor rework is needed before sign-off.