Jebel Ali Village Trakhees Format Drawings
Get your drawings converted or prepared in Trakhees-required format for Jebel Ali Village submission.
What Is 'Trakhees Format' for Drawings?
Trakhees has specific formatting, scale, title block, and stamping requirements for structural and architectural drawings submitted for approval in Jebel Ali Village. Drawings prepared for a different authority, or informally by a contractor, usually don't meet this format and get rejected on submission. We convert or prepare your drawings correctly.
What you need to know
- Trakhees Approvals We Handle in Jebel Ali Village: Drawing format services we provide for Jebel Ali Village submissions.
- Ready to Start Your Jebel Ali Village Approval?: Speak with our structural engineering team today and get a clear scope, timeline, and fixed quote for your project.
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
Documents you will need
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
At a glance
Jebel Ali Village Trakhees Format Drawings at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Surveys the site and prepares drawings to the format of the developer and the authority. | — |
| Master developer (where the community has one) Step 2 | Issues the community NOC against its design guidelines. | — |
| Building authority — Trakhees Step 3 | Building permit; work starts only after it is issued. | — |
| Developer and authority Step 4 | Completion inspection and sign-off. | — |
How it works
How We Handle Your Jebel Ali Village Approval
We inspect your villa and confirm exactly what documentation and approvals your work needs before anything is submitted.
Our engineers prepare structural drawings and calculations in Trakhees format, stamped and ready for submission.
We submit your application and drawings to Trakhees on your behalf and track it through review.
If Trakhees raises a comment or requests a revision, we handle it directly so your approval doesn't stall.
Once approved, you receive your NOC or permit ready to hand to your contractor or building management.
We stay available through construction for inspections, as-built drawings, or final sign-off if your approval requires it.
Who does what
Three parties, one route
Nakheel
Master developer of Jebel Ali Village. Issues the NOC; we apply as your consultant.
Nakheel approvals →Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →Approval Types
- New Drawing Preparation in Trakhees Format
- Converting Existing Drawings to Trakhees Format
- Title Block & Stamp Compliance
- Scale & Dimension Standardization
- Digital Format Conversion (CAD/PDF)
- Drawing Set Compilation for Submission
Why applications come back
- Drawings that do not match the villa as it stands
- AutoCAD in DLTM coordinates not supplied where asked
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
Can my contractor's drawings be used directly for Trakhees submission?
Usually not without conversion — contractor drawings often lack the stamping, format, and technical detail Trakhees requires from a registered consultant.
What is the difference between Trakhees format and Dubai Municipality format?
Each authority has its own title block, submission standards, and required details. Drawings must be prepared or converted specifically for the authority you are submitting to.
Can you convert drawings I already have from another project?
Yes, if the underlying design is sound, we can reformat and re-stamp existing drawings to meet Trakhees' submission standards.
Why does formatting matter if the design itself is correct?
Trakhees reviewers check format compliance before technical review — incorrectly formatted drawings are often returned unreviewed, wasting time.
Related guides