JAFZA Wall Removal Permit (Trakhees)

A JAFZA Wall Removal Permit is required before removing or altering a structural or load-bearing wall within a Trakhees-regulated warehouse. Structural Solutions prepares the documentation and manages the complete Trakhees CED submission for JAFZA and Nakheel-community warehouse and industrial projects.

What is JAFZA Wall Removal Permit (Trakhees)?

A JAFZA Wall Removal Permit is required before removing or altering a structural or load-bearing wall within a Trakhees-regulated warehouse. Trakhees CED — the Civil Engineering Department of Dubai's Ports, Customs & Free Zone Corporation — regulates JAFZA and several Nakheel-developed communities, using its own drawing format and documentation standards distinct from DDA and Dubai Municipality.

Load-Bearing CheckBefore any removal
Beam DesignStamped calculations
NOC + PermitCommunity and authority

What you need to know

  • When Do You Need JAFZA Wall Removal Permit (Trakhees)?: A JAFZA Wall Removal Permit is required before removing or altering a structural or load-bearing wall within a Trakhees-regulated warehouse. Documentation must be prepared by a UAE-licensed engineer and submitted in Trakhees CED's required format before works begin, or as part of a regularisation submission if works are already underway.
  • Load-bearing check: every wall is assessed before removal — never assumed.
  • New beam or lintel: a load-bearing wall needs a designed beam with stamped calculations.
  • Temporary propping: the structure above is supported while the wall is removed.
  • Partitions still need a NOC: non-structural walls can still require the community NOC.
  • Inspection after works: the opening is checked against the approved drawings.

Documents you will need

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Existing approved drawings — or an as-built survey if you have none
  • Photos of the wall and the rooms on both sides
  • Proposed drawings and stamped structural calculations

At a glance

JAFZA Wall Removal Permit (Trakhees) at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Confirms whether the wall is load-bearing and designs the beam or lintel with stamped calculations.—
Nakheel (master developer)
Step 2
Issues the community NOC against its design guidelines.—
Building authority — Trakhees
Step 3
Building permit; work starts only after it is issued.—
Developer and authority
Step 4
Completion inspection and sign-off.—

How it works

JAFZA Wall Removal Permit (Trakhees) Process

Scope Assessment & Documentation Review

Structural Drawings Prepared to Trakhees CED Format

Trakhees CED Portal Submission

Trakhees CED Technical Review

Fee Payment & Issuance

Works Cleared / Approval Confirmed

Who does what

Who does what in JAFZA

🏭

JAFZA

Free zone authority. Its NOC comes first for works in a JAFZA plot or unit.

JAFZA approvals →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

What Trakhees CED Reviews

  • Structural Load & Safety Compliance
  • Drawing Format & Documentation Standards
  • Site & Boundary Compliance
  • Registered Engineer Verification
  • Fee Assessment
  • Inspection & Sign-Off Requirements

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Works started before the permit
  • Missing landlord NOC or licence documents
  • Fire safety items not shown

Questions

Questions owners ask

Who issues approval for wall removal permit?

The Civil Engineering Department (CED) of Trakhees, which regulates JAFZA and Nakheel-developed communities.

Does Trakhees CED use different standards than DDA or DM?

Yes. Trakhees CED has its own drawing format and documentation requirements, distinct from DDA and Dubai Municipality standards.

What happens without approval for wall removal permit?

Works carried out without the required approval are considered unauthorized and may be issued a stop-work order or penalty, with regularisation required before sign-off.

Can Structural Solutions handle the full process?

Yes. We prepare drawings and documentation, manage the CED portal submission, and carry the project through to issuance.