JAFZA Wall Removal Permit (Trakhees)
A JAFZA Wall Removal Permit is required before removing or altering a structural or load-bearing wall within a Trakhees-regulated warehouse. Structural Solutions prepares the documentation and manages the complete Trakhees CED submission for JAFZA and Nakheel-community warehouse and industrial projects.
What is JAFZA Wall Removal Permit (Trakhees)?
A JAFZA Wall Removal Permit is required before removing or altering a structural or load-bearing wall within a Trakhees-regulated warehouse. Trakhees CED — the Civil Engineering Department of Dubai's Ports, Customs & Free Zone Corporation — regulates JAFZA and several Nakheel-developed communities, using its own drawing format and documentation standards distinct from DDA and Dubai Municipality.
What you need to know
- When Do You Need JAFZA Wall Removal Permit (Trakhees)?: A JAFZA Wall Removal Permit is required before removing or altering a structural or load-bearing wall within a Trakhees-regulated warehouse. Documentation must be prepared by a UAE-licensed engineer and submitted in Trakhees CED's required format before works begin, or as part of a regularisation submission if works are already underway.
- Load-bearing check: every wall is assessed before removal — never assumed.
- New beam or lintel: a load-bearing wall needs a designed beam with stamped calculations.
- Temporary propping: the structure above is supported while the wall is removed.
- Partitions still need a NOC: non-structural walls can still require the community NOC.
- Inspection after works: the opening is checked against the approved drawings.
Documents you will need
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Existing approved drawings — or an as-built survey if you have none
- Photos of the wall and the rooms on both sides
- Proposed drawings and stamped structural calculations
At a glance
JAFZA Wall Removal Permit (Trakhees) at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Confirms whether the wall is load-bearing and designs the beam or lintel with stamped calculations. | — |
| Nakheel (master developer) Step 2 | Issues the community NOC against its design guidelines. | — |
| Building authority — Trakhees Step 3 | Building permit; work starts only after it is issued. | — |
| Developer and authority Step 4 | Completion inspection and sign-off. | — |
How it works
JAFZA Wall Removal Permit (Trakhees) Process
Scope Assessment & Documentation Review
Structural Drawings Prepared to Trakhees CED Format
Trakhees CED Portal Submission
Trakhees CED Technical Review
Fee Payment & Issuance
Works Cleared / Approval Confirmed
Who does what
Who does what in JAFZA
Trakhees
Civil Engineering Department (CED): building permit for structural works and inspection at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits for you as the approved consultant.
Talk to our engineers →What Trakhees CED Reviews
- Structural Load & Safety Compliance
- Drawing Format & Documentation Standards
- Site & Boundary Compliance
- Registered Engineer Verification
- Fee Assessment
- Inspection & Sign-Off Requirements
Why applications come back
- Drawings not in the format Trakhees asks for
- No stamped structural calculations
- Works started before the permit
- Missing landlord NOC or licence documents
- Fire safety items not shown
Questions
Questions owners ask
Who issues approval for wall removal permit?
The Civil Engineering Department (CED) of Trakhees, which regulates JAFZA and Nakheel-developed communities.
Does Trakhees CED use different standards than DDA or DM?
Yes. Trakhees CED has its own drawing format and documentation requirements, distinct from DDA and Dubai Municipality standards.
What happens without approval for wall removal permit?
Works carried out without the required approval are considered unauthorized and may be issued a stop-work order or penalty, with regularisation required before sign-off.
Can Structural Solutions handle the full process?
Yes. We prepare drawings and documentation, manage the CED portal submission, and carry the project through to issuance.