JAFZA · Trakhees

JAFZA Structural Wall Opening Approval

A new or wider opening in a wall needs the JAFZA NOC and a Trakhees CED permit where the wall is structural. We check the wall, design the opening with stamped calculations and handle the approvals.

The short answer

Cutting a new opening, or widening one, in a warehouse or office wall in JAFZA starts with the JAFZA NOC. If the wall carries load, the opening needs a new beam or lintel designed by a structural engineer, stamped calculations and a Trakhees CED permit, followed by inspection at completion. Civil Defence approval is needed where fire safety is affected.

First approvalJAFZA NOC
Building permitTrakhees CED
Fire safetyCivil Defence where affected

What you need to know

  • Load-bearing or not: An engineer checks the drawings and the wall on site before anything is cut.
  • New beam or lintel: Openings in structural walls need a designed beam or lintel and temporary support during works.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant.
  • Completion: Trakhees inspects at completion and closes the permit.

Documents you will need

  • Trade licence and lease or title deed
  • Landlord NOC for tenants
  • Existing or as-built drawings
  • Opening design and stamped structural calculations
  • Photos of the wall

At a glance

JAFZA Structural Wall Opening Approval at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Checks the wall and designs the opening with stamped calculations.—
JAFZA
Step 2
Issues the NOC for the works.—
Trakhees CED
Step 3
Reviews the drawings and issues the permit.—
Trakhees CED
Step 4
Inspection and completion.—

How it works

How it works

Site check

Existing drawings or survey

Opening design and calculations

JAFZA NOC

Trakhees CED permit

Works and inspection

Who does what

Who does what

🏭

JAFZA

Free zone authority. Its NOC comes first for works in a JAFZA plot or unit.

JAFZA approvals →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

Common openings

  • New door between warehouse and office
  • Wider loading openings
  • Openings for new partitions or mezzanine access

Why applications come back

  • No stamped structural calculations
  • Drawings not in the format Trakhees asks for
  • Works started before the permit
  • Missing NOC or documents

Questions

Questions owners ask

Do I need a permit to make an opening in a wall?

Where the wall is structural, yes: the JAFZA NOC and a Trakhees CED permit with stamped calculations.

How do I know if the wall is load-bearing?

An engineer checks the drawings and the wall on site.

Can I widen an existing opening?

Widening changes the opening in the wall, so it follows the same route.

What if the opening was already made?

It can be assessed and regularised where it meets the requirements; otherwise it needs changing.

Related guides

Keep reading