I Just Bought a Villa in Dubai Hills: What Can I Change?
If you just bought in Dubai Hills, you can change a lot inside. Outside and structural works need Emaar’s NOC, and a DDA permit for structure.
The short answer
Congratulations on the new home. Inside, finishes, cabinets and non-structural walls are allowed if the structure and waterproofing are not affected. A pool, pergola, shade or solar panels need an Emaar NOC, within Emaar’s rules. Extensions are reviewed case by case. Send us your villa type and idea, and we will advise on your case. Garages stay parking, and Emaar reviews balcony closures case by case. First, get your as-built plans from Emaar and check for any earlier unapproved works.
Emaar’s rules
Emaar’s document checklist for a villa or townhouse NOC
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Drawings | Detailed architectural drawings, existing and proposed. |
| Elevations | Existing and proposed. |
| Scope | A detailed scope of works. |
| Photos | External photos for external changes such as paint, garage door, gate or fence. |
| Licence | Copy of the contractor or consultant licence. |
| 3D | A coloured 3D concept drawing. |
| Affection plan | For independent villas. |
| Completion certificate | The villa’s Building Completion Certificate, for all requests except soft landscaping. |
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- First step: Get the as-built plans from Emaar.
- Earlier owners: Check what they changed and whether it was approved.
- Popular requests: Pools, pergolas, shade and kitchens.
- Not allowed: Garage rooms.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
Applied through the Emaar Community Portal.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Emaar
Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.
What is an Emaar NOC? →Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Can I renovate straight away?
Interior finishes, yes. Your contractor needs an Emaar entry permit.
Can I extend?
It depends on your villa. Ask us and we will advise.
Who gives me the plans?
Emaar provides as-built plans to owners.
Can I build a pool?
Yes, with an Emaar NOC, a DDA permit and the pool environmental NOC.
Related guides
