Front of shop · Notice

I Got a Notice for Using the Space Outside My Shop

A notice for seating, displays or structures outside the shop. Here is how to respond.

Read who issued it and what it covers: RTA, the authority, the developer or the mall. Usually the items must be removed or approved. We check whether the use can be approved, prepare the drawings and apply. For structures already built, the as-built route applies. A fine may apply, depending on the case.

FirstRead the notice
FromRTA, authority, developer or mall
ThenRemove or approve
I Got a Notice for Using the Space Outside My Shop

Official sources: RTA · Dubai Municipality · DDA · Trakhees · Dubai Civil Defence

What decides it

  • Notice: Who and what
  • Items: Seating, display, structures
  • Approval: Possible or not
  • Structures: As-built route

Documents you will need

  • Trade licence and lease
  • Landlord or building NOC (or we request it with you)
  • Photos of the unit and the space in front
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your shop and area.

StepApproval routeGuides
Developer or landlord
Developer, building or mall
In communities the developer must approve first; in malls, the mall management.—
RTA
RTA
Use of the pavement or right of way on a public road.RTA right of way NOC
Authority
DM, DDA or Trakhees
The authority for the area approves the use and any structure.—
Structure
Consultant
Awnings, canopies, ramps and enclosures designed and checked.Canopy calculations
Civil Defence
DCD
Where exits or fire safety are affected.—

How it works

How we get it approved

1. Send us the details

Area, building, unit and what you want to add.

2. We confirm the route

Developer, RTA, authority and DCD.

3. Site check

Structure and the space.

4. Drawings

Layout, structure, fire safety.

5. Approvals

We submit and follow up.

6. Completion

Inspection, then you open.

What causes problems

  • Ignoring the notice
  • Adding more items
  • Building structures meanwhile

Extending your shop?

Get your route confirmed

Send us three things on WhatsApp:

  1. Area, building and unit number
  2. Photos of the unit and the space in front
  3. What you want to add

We confirm who approves it and handle the drawings and approvals.

Questions

Questions

Is there a fine?

A fine may apply, depending on the case.

Can the use be approved?

Sometimes. We check your case.

What should I send you?

The notice and photos of the space.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading