AutoCAD and PDF drawings showing the property as built, ready to use as the base for applications, sales or design work.
How Are As-Built Drawings Prepared?
As-built drawings are prepared by surveying the property on site, recording every dimension and element, then drafting the results in AutoCAD and having them reviewed by an engineer before they are issued.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Step by Step
We visit the property, measure rooms, walls, openings and levels, note structural elements and external works, then draft floor plans, elevations and sections. The set is checked against the site and reviewed before issue.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
What You Receive
Situations We Help With
Villa
Apartment
Warehouse
Office or Shop
Extension Area Only
Full Property
Simple Approval Process
How Our Approval Process Works
We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.
Quick Review
We review drawings and project requirements fast.
Plan Design
Our team prepares compliant
drawings and files.
Easy Submit
We submit documents to
Dubai authorities safely.
Final Permit
Receive approvals and
permits without delays.
Proven track record
Across Dubai
Established firm
Years of experience
Highly rated
By our clients
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
How Are As-Built Drawings Prepared? — FAQs
How are as-built drawings prepared?
By an on-site measured survey, AutoCAD drafting and engineer review.
What do they include?
Floor plans, elevations, sections and key details.
What format are they?
AutoCAD and PDF.
Do you visit the property?
Yes.
Can they be stamped?
Yes, for submission.