Farm Gardens · The Valley · Emaar

Farm Gardens Villa NOC (The Valley)

What needs an Emaar NOC in Farm Gardens? The approvals, the route and the Emaar rates.

Most outside and structural changes in Farm Gardens, The Valley, need the Emaar NOC before work starts, then a DDA building permit with stamped calculations: extensions, balcony closures, garage conversions, pools, pergolas and wall removal. Emaar charges on the added GFA: villas AED 1,000 per sq ft up to 10%, AED 3,000 from 10% to 20% and AED 6,000 above 20%, everything above 10% subject to Emaar Management approval; townhouses a flat AED 1,000 per sq ft. We check your idea against the guidelines and handle both approvals.

What we check first

  • Plot: Setbacks
  • Home type: Townhouse or villa
  • Structure: Walls and slabs
  • Area: Added GFA
  • Look: Guidelines
  • Route: Emaar, then DDA

Documents you will need

  • Unit and plot number
  • Title deed and owner ID
  • Photos of the home and the area
  • A sketch or short description of the idea
  • Emaar plans, if you have them

Route

The approval route in The Valley

We confirm the route for your home.

StepApproval routeGuides
Early check
Our engineers
Your idea, photos and plot. We get the plans from Emaar and check them on site.—
Drawings
Structural Solutions
Drawings and stamped structural calculations.—
Emaar NOC
Emaar
Reviews the design against the community guidelines and issues the NOC.—
Permit
Dubai Development Authority (DDA)
Building permit for structural works and added area.—
Completion
Emaar and DDA
Inspections, Emaar clearance and the completion certificate.—

How it works

How it works

1. Send us the idea

Unit number, photos and what you want.

2. Plans

From Emaar, checked on site.

3. Early check

Guidelines, area and structure.

4. Drawings

Drawings and calculations.

5. Emaar NOC

Emaar review.

6. Permit

Then works and completion.

What causes problems

  • Starting works before the NOC
  • Works near shared walls without a design
  • Structural works without the DDA permit

Home in The Valley?

Check your idea first

Send us three things on WhatsApp:

  1. Unit number
  2. Photos of the area
  3. What you want to do

We check the Emaar rules and the structure, then handle the Emaar NOC and the permit.

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions

What needs an Emaar NOC in Farm Gardens?

Extensions, closures, garage conversions, pools, pergolas, wall removal and facade changes.

Who issues the permit?

DDA, after the Emaar NOC.

What does Emaar charge for added area?

Villas AED 1,000 per sq ft up to 10% with higher bands; townhouses a flat AED 1,000 per sq ft.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading