Dubai Holding sewerage connection NOC: design to discharge

Connecting a villa or building to the sewer in a Dubai Holding community goes through three NOCs: connection design, sewerage construction, and inspection, discharge and completion. We prepare the drainage drawings and submit each stage.

The short answer

The sewerage connection (design) NOC approves the drainage layout and the connection to the community sewer. The sewerage construction NOC covers building it. The connection (inspection / discharge / completion) NOC is the inspection before the property is allowed to discharge. If the connection works are in the road reserve, the right of way NOC and RTA steps also apply.

Stage 1Connection design
Stage 2Sewerage construction
Stage 3Inspection, discharge, completion
In the road reserveROW NOC and RTA too

When you need a sewerage NOC

  • New villa or building: A new connection to the community sewer
  • Changed connection: Moving or adding a connection
  • Larger works: Works that change the drainage layout
  • Road reserve: Connection works outside the plot
  • Inspection: Before discharge is allowed
  • Renewal: When construction runs longer

Documents you will need

  • Drainage layout and connection details (we prepare these)
  • Levels of the manholes and the connection
  • Site services information
  • Title deed and affection plan
  • Contractor trade licence

NOC types

The three sewerage NOCs

Applied for in this order.

NOCApproval routeGuides
Sewerage connection (design)
Dubai Holding
Drainage layout and connection to the community sewer. New or renewal.—
Sewerage construction
Dubai Holding
Building the connection. New or renewal.—
Sewerage connection (inspection / discharge / completion)
Dubai Holding
Inspection before discharge is allowed.—

How it works

How we get it done

1. Survey

Existing manholes, levels and services.

2. Design

Drainage layout and connection details.

3. Design NOC

Sewerage connection (design).

4. Construction NOC

Sewerage construction.

5. Build

By your contractor.

6. Inspection

Discharge and completion.

What owners ask us about

Common reasons for comments

  • Levels that do not work with the existing sewer
  • Existing services not shown
  • Discharge before inspection
  • Construction NOC expired

Need a sewer connection?

Get your sewerage NOCs

Send us three things on WhatsApp:

  1. Your community and plot number
  2. Photos of the manhole or connection point
  3. What you are building

We design the connection and handle the three Dubai Holding sewerage NOCs.

Questions

Questions

How do I connect to the sewer in a Dubai Holding community?

Get the sewerage connection (design) NOC, then the sewerage construction NOC, then the inspection / discharge / completion NOC before discharging.

Do I need a sewerage NOC for a new villa?

Yes. A new connection goes through all three stages.

Do I need a sewerage NOC for an extension or a new bathroom?

Only if the works add or change the connection to the community sewer. We check your drainage layout.

What drawings are needed?

The drainage layout, the connection and manhole details, and the levels. We prepare them.

Who inspects the connection?

It is inspected under the inspection / discharge / completion NOC before discharge is allowed.

Can I discharge before the inspection?

No. Discharge is only allowed after the inspection.

Do I need a ROW NOC as well?

If the connection works are in the road reserve, yes, and the RTA NOC after it.

Can the sewerage construction NOC be renewed?

Yes, if construction runs longer.

Who can apply for a Dubai Holding NOC?

Only registered consultants and contractors can apply on the Dubai Holding Community Management NOC portal. Owners cannot apply themselves. We are registered and submit for our clients.