DDA Application Rejected? Understanding Comments and Resubmission

A rejection isn't the end of the process — here's how to read the comment sheet and get your resubmission approved.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What Does a DDA Comment Sheet Actually Mean?

When DDA returns your submission with comments rather than an approval, the review team has flagged specific items on your drawings or documents that need to be addressed before they'll proceed. Understanding exactly what each comment means, and responding to it correctly, is what separates a clean resubmission from a submission stuck in repeated rounds of review.

How We Handle Your Resubmission

01

We review the DDA comment sheet line by line to understand exactly what's being requested for each item.

02

We identify whether the issue is in the drawings, the supporting documents, or missing information, so we fix the right thing.

03

We revise the structural drawings and documents to directly address each comment raised.

04

Where a comment is unclear or seems to conflict with another requirement, we liaise with DDA directly to clarify before resubmitting.

05

We resubmit the completed package through the DDA portal and track the review.

06

If a site inspection is requested as part of the review, we coordinate and attend it with you.

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Related Approval Guides

More on navigating DDA and authority approvals.

You May Also Need

Villa Renovation Approvals: Documents, Costs & Stages

DDA Building Permit Dubai

DDA Approval Services in Dubai

As-Built Drawings for DM, DDA, Nakheel & Trakhees

Structural Calculations in Dubai

DDA Villa Extension NOC Dubai

DDA Application Rejected? Understanding Comments and Resubmission at a Glance

StepWhoWhat happens
1Structural engineerPrepares the drawings and calculations to the authority's format and handles the submissions.
2Master developer (where the community has one)Issues the community NOC against its design guidelines.
3Building authority — DDABuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Existing approved drawings — or an as-built survey if you have none
  • Proposed drawings and stamped structural calculations — prepared by us

Key Technical Rules

  • One authority per area: each community has one building authority — DM, DDA or Trakhees.
  • NOC before permit: in master-developer communities the developer NOC comes first.
  • Authority format: drawings must follow that authority's submission format.
  • Registered consultant: submissions are made by an authority-registered consultant.
  • Completion certificate: issued after the final inspection.
Structural Solutions Engineering Team Reviewing Approval Documents

We Read Comment Sheets for a Living

DDA reviewer comments can be terse or technical — we translate exactly what's being asked so nothing gets missed on resubmission.

Direct DDA Liaison

Where a comment needs clarification, we contact DDA directly rather than guessing at the intended fix.

We Fix the Cause, Not Just the Symptom

We check whether a rejection reflects a one-off drawing error or a deeper issue with the design approach, so it doesn't recur on the next submission.

Why Property Owners Choose Us

Fixed-Fee Resubmission Support

A clear quote to review your comment sheet and prepare the resubmission — no open-ended billing while the file goes back and forth.

Full Process Managed

We prioritise rejected submissions, since every extra round of review adds to your project timeline.

End-to-End Support

From reading the comment sheet to a confirmed resubmission, we manage the entire correction process.

Got a DDA Rejection or Comment Sheet?

Send it over and we'll tell you exactly what needs to change.

Frequently Asked Questions

What's the difference between a rejection and a comment?

A comment means DDA wants specific changes before approving — it's not a final rejection. A small number of applications are outright rejected and need to restart the process.

What do you need from me to get started?

Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works — we confirm the approvals needed and prepare the submission.

Can you help if someone else prepared the original drawings?

Yes — we regularly step in on submissions we didn't originally prepare, and review the comment sheet against the existing drawings before revising.

Will a resubmission cost extra in authority fees?

Typically not for addressing a comment sheet within the same submission cycle, though this depends on the submission type — we confirm this for your specific case.

What if my resubmission gets a second round of comments?

We review the new comments the same way as the first round and continue revising until approval — this is included in our resubmission support.