Dubai Municipality · Documents

Consultant Change Documents Required in Dubai

Two documents carry the application: the owner’s declaration and the technical report.

Structural Solutions is a Dubai engineering consultancy. We prepare the technical report and the application, and can take over as your new consultant, with or without the outgoing consultant’s agreement. With agreement: the application signed by both consultants, the owner’s declaration and the outgoing consultant’s technical report, endorsed by the new consultant. Without agreement: the new consultant signs, with the owner’s declaration and its own technical report.

RuleAdministrative Resolution No. 275 of 2024
AuthorityDubai Municipality
Submitted byYour consultant

The document pack

  • Application: Signed by the new consultant
  • Outgoing consultant: Signs too, if it agrees
  • Owner: Declaration approving the change
  • Technical report: Stage of the works vs approved drawings
  • Licence: New consultant, right classification
  • Permit: Issued in the new consultant’s name

Documents you will need

  • Building permit number and approved drawings
  • Owner ID and title deed
  • Correspondence with the current consultant
  • Photos of the site

Dubai law

What Dubai law says about changing a consultant

Consultant changes on a Dubai Municipality building permit follow Administrative Resolution No. 275 of 2024, issued by Dubai Municipality on 6 August 2024.

With the consultant’s agreement

The application is signed by the outgoing and the new consultant, with the owner’s declaration and a technical report from the outgoing consultant on the stage of the works and whether they match the permit and the approved drawings. The new consultant endorses the report.

Without the consultant’s agreement

The new consultant signs the application with the owner’s declaration and its own technical report. Dubai Municipality asks the outgoing consultant to respond within no more than 5 working days. In a financial or contractual dispute, or with no response, the change is approved and the outgoing consultant has up to 15 days to hand over the site.

If it is a technical dispute

If the disagreement is technical or engineering, Dubai Municipality checks the issues and approves or rejects the change case by case.

What the new consultant needs

The new consultant must be licensed in Dubai, with a classification not lower than the building’s. It starts only after the new building permit is issued in its name.

Before the building permit

If the consultant changes before the permit is issued, the same routes apply, without the technical report or the site handover period.

Who can apply

The owner can also apply. In practice the new consultant prepares the report and the application.

Our role: we can take over as your consultant: we inspect the site, prepare the technical report and the owner’s declaration, and submit the change.

Route

The Dubai Municipality consultant change route

With or without the outgoing consultant’s agreement.

StepApproval routeGuides
Appointment
Owner
Declaration approving the change and appointing the new consultant.—
Technical report
New or outgoing consultant
Stage of the works and whether they match the permit and the approved drawings.—
Application
New consultant
Signed by the outgoing consultant too, if it agrees.—
Response
Outgoing consultant
Without agreement: up to 5 working days; up to 15 days to hand over the site.—
New permit
Dubai Municipality
Issued in the new consultant’s name, after the fees.—
Supervision
New consultant
Starts after the new permit and continues to completion.—

How it works

How we handle it

1. Send us the details

Permit number, area and what happened.

2. Site visit

We record the works done.

3. Technical report

Stage of the works vs the approved drawings.

4. Application

With your declaration.

5. Submission

By us, with follow-up.

6. We take over

Once the new permit is in our name.

What causes problems

  • New consultant acting before the new permit
  • No technical report on the works done
  • Open authority comments left unanswered

Need help with this?

Get your contractor change moving

Send us three things on WhatsApp:

  1. Your building permit number and area
  2. What happened with the current contractor or consultant
  3. Photos of the site and any approved drawings

Our engineers inspect the site, prepare the technical report and submit the change for you.

Questions

Questions

Do I need a release letter from the old consultant?

No separate letter is required by the resolution. Without agreement, the new consultant applies on its own with your declaration.

What if the old consultant will not agree?

The change can still go ahead. The new consultant applies with the owner’s declaration and its own technical report. Dubai Municipality gives the outgoing consultant up to 5 working days to respond. In a financial or contractual dispute, or with no response, the change is approved and the outgoing consultant has up to 15 days to hand over the site.

What does the owner sign?

A declaration approving the change, appointing the new consultant and confirming the information is correct.

Can the new consultant start straight away?

No. The new consultant starts its duties only after Dubai Municipality issues the new building permit in its name.

Who can take over as my consultant in Dubai?

A licensed engineering consultancy. Structural Solutions can take over as your consultant on Dubai Municipality permits, prepare the technical report and submit the change, with or without the outgoing consultant’s agreement.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading