Commercial Building As-Built Drawings Dubai

We prepare as-built drawings for commercial buildings, offices, shops and showrooms in Dubai — for fit-out approvals, landlord submissions, change of use and completion.

We get your drawings for you

No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.

How to get your property drawings →Request online →WhatsApp us
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Where They Are Needed

Landlords, building management and authorities often need accurate existing drawings before approving fit-outs or changes, especially in older buildings where original drawings are hard to find.

How We Prepare Your Drawings

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Stamped Drawings Issued

06

Submission Support

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Stamped for Submission

Our engineers review the as-built set and can stamp it for mall, building management or authority submission.

Common Projects We Handle

Office Fit-Out

Retail Unit

Showroom

Restaurant

Change of Use

Older Building With No Drawings

Commercial Building As-Built Drawings Dubai at a Glance

StepWhoWhat happens
1Structural engineerPrepares the fit-out drawings, structural checks and stamped calculations where needed.
2Landlord, building management or mallIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Civil Defence (DCD)Fire and life safety approval where required.
5Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, building management or mall NOC
  • Proposed layout and fit-out drawings
  • Structural calculations where loads or openings change

Key Technical Rules

  • Landlord or mall NOC: required before the authority submission.
  • Authority permit: from DM, DDA, Trakhees or the free zone, depending on the location.
  • Civil Defence: fire and life safety approval where the activity requires it.
  • Structural check: for new loads, openings or mezzanines.
  • Completion inspection: before the unit opens.
Villa Drawings for Dubai Emaar Extension Fees

Landlord NOC

First approval

Authority Permit

By location

Civil Defence

Where required

Why Owners Choose Structural Solutions for Drawings

Measured On Site

Our team surveys the property in person, so the drawings show what is actually built.

Authority-Ready Formats

Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.

Engineer Reviewed & Stamped

Every set is reviewed by our engineers and can be stamped for submission.

Get Your Drawings Prepared

Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.

Commercial Building As-Built Drawings Dubai — FAQs

Do commercial units need as-built drawings?

Often, before fit-out approvals or changes of use.

Can you stamp them?

Yes, for submission.

Do you cover malls?

Yes.

Do you survey on site?

Yes.

Can you prepare proposed drawings too?

Yes.