Cloud Kitchen Permit in Dubai
A cloud kitchen has no dining room, but it is still a food premises. The kitchen goes through the same approvals as a restaurant kitchen.
A cloud kitchen, also called a dark kitchen or delivery kitchen, needs the same food approvals as a restaurant kitchen in Dubai. The landlord or building management agrees to the use. Dubai Municipality Food Safety approves the kitchen layout, in every area of Dubai. The authority for the area issues the fit-out permit, and Civil Defence (DCD) approves the kitchen exhaust and fire safety. Before opening, DM Food Safety inspects the kitchen. If several brands cook from one kitchen, the layout shows how each brand works without crossing over. We check the unit, design the kitchen layout, exhaust and drainage, and submit the approvals.
Approvals
Who approves a cloud kitchen
| Step | Who | Guide |
|---|---|---|
| NOC for the use | Landlord or building management | the fit-out NOC |
| Kitchen layout | DM Food Safety | kitchen layout approval |
| Fit-out permit | Authority for the area | Food Safety in DDA, Trakhees and DSO areas |
| Exhaust and fire safety | DCD | kitchen exhaust and DCD |
| Grease trap | Drainage approval | grease trap NOC |
| Inspection before opening | DM Food Safety | the inspection before opening |
Before you sign a lease
What we check in the unit
| Check | Why |
|---|---|
| Use allowed | Some buildings and warehouses do not allow food |
| Exhaust route | A path to the roof or facade for the kitchen exhaust |
| Drainage | A connection for a grease trap |
| Power and gas | Cooking load; LPG has its own approval: LPG approval |
| Pickup point | Where riders collect orders |
| Floor load | Cold rooms and heavy equipment |
By area
Cloud kitchens in other setups
| Setup | Guide |
|---|---|
| TECOM | TECOM cloud kitchen |
| Dark store or delivery kitchen | dark store and delivery kitchen |
| Question: do I need DM approval? | DM approval for a cloud kitchen |
Official sites: Dubai Municipality | Dubai Civil Defence
What you need to know
- Same approvals as a restaurant kitchen.
- DM Food Safety in every area.
- DCD for exhaust.
- Check the unit before the lease.
Documents you will need
- Trade licence or initial approval
- Tenancy contract or Ejari
- Landlord NOC
- Brands, menus and equipment list
How it works
Cloud kitchen permit, step by step
1. Check
Unit.
2. NOC
Landlord.
3. Design
Kitchen, MEP.
4. Food Safety
Layout.
5. Permits
Fit-out, DCD.
6. Open
Inspection.
Questions
Cloud kitchen permit: questions
Do cloud kitchens need a permit in Dubai?
Yes. The kitchen layout is approved by DM Food Safety, the fit-out by the authority for the area and the exhaust and fire safety by DCD.
Is there a minimum size for a cloud kitchen?
It depends on the menu, the brands and the equipment; the layout has to work for safe food preparation. We check your unit.
Can several brands use one cloud kitchen?
Yes, if the layout shows how each brand works safely. The brands are listed on the trade licence by the business owner.
Can I open a cloud kitchen in a warehouse?
Only if the use is allowed and the exhaust, drainage and fire safety can be provided. Contact us and we check the unit.
Is a cloud kitchen in TECOM different?
TECOM has its own fit-out route. See TECOM cloud kitchen.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions designs and gets approvals for cloud kitchens and delivery kitchens in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
