Arabian Ranches · Emaar

Can I Widen a Door or Window in My Arabian Ranches Villa?

You can widen a door or window in Arabian Ranches on the ground floor at the side or rear, in a non-structural wall, keeping 0.3 m of blockwork at each end.

The short answer

Yes, on the ground floor, at the side or rear of the villa, if the wall is not structural. Emaar’s guide keeps at least 0.3 m of blockwork at each end of the opening, limits a door opening to 0.9 m, and requires the same material, colour and design as the villa. First-floor windows and ground-floor front windows cannot be changed. We check whether the wall is structural before you apply for the Emaar NOC.

WhereGround floor, side or rear
Keep0.3 m of blockwork each end
Door opening0.9 m at most

Emaar’s guide

Door and window rules in Arabian Ranches

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
Like for likeExisting doors can be replaced with the same specification and colour.
WideningGround floor only, in a non-structural wall. At least 0.3 m of blockwork stays at each end.
Door opening0.9 m at most.
Not allowedChanges to first-floor windows and ground-floor front windows.
AllowedGround-floor side and rear windows, in non-structural walls.
Two openingsTwo doors or windows split by a small non-structural wall can become one sliding door or window.
FinishSame material, colour and design as the villa.
TownhousesNew openings on side walls only, with enough setback. A sliding door can widen by at most 0.3 m each side.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Is the wall structural?: This decides it. Structural walls are not widened under this rule.
  • Front of the villa: Ground-floor front windows stay as they are.
  • First floor: No window changes.
  • Sliding doors: Two openings split by a small non-structural wall can become one sliding door or window.
  • Townhouses: A sliding door can widen by at most 0.3 m each side.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

Applied through the Emaar Community Portal.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Can I make my window bigger in Arabian Ranches?

Yes on the ground floor at the side or rear, in a non-structural wall.

Can I change a front window?

No, ground-floor front windows and first-floor windows cannot be changed.

Can I turn a window into a door?

Yes in a non-structural wall, with a door opening of up to 0.9 m and a matching finish.

How do I know if the wall is structural?

Our engineers check the as-built plans and the wall on site.

Do I need an Emaar NOC?

Yes, external changes go through the Emaar Community Portal.