Can I Turn My Double-Height Room Into an Extra Room in Arabian Ranches?
Yes, a double-height room in Arabian Ranches can be filled with a new slab, with structural approval before works, and it adds GFA.
Yes. Emaar’s guide allows interior voids and double-height ceilings to be enclosed if structural approval is obtained before works start. The slab is cast with independent columns so the existing structure is not disturbed, or built with bolted steel beams, subject to Emaar and authority approval. In Arabian Ranches the authority is DDA. The new floor is charged on the added GFA. We check the structure and prepare the drawings and calculations.
Emaar’s guide
Enclosure rules: patio, balcony, terrace and voids
Emaar reviews these as added area. From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.
| Item | What the guide says |
|---|---|
| Patio | Allowed if the external elevation does not change. On the front, keep the arch: windows and doors sit flush with its inner edge. |
| Courtyard | Only an open courtyard at G+1 level, within the building line, with a matching parapet. |
| Rear balcony with a roof | Can be closed with non-reflective glass, clear glass or block wall. |
| Rear balcony without a roof | Can be closed with a new concrete roof and a parapet level with the existing one, subject to approval. |
| Front balcony | Strictly not allowed. |
| Inaccessible terrace | On the rear or side, it can become living space, matching the villa. |
| Main door | Can move only onto an existing slab, and must not block a window or vent. |
| Void or double-height space | Allowed with structural approval before works: independent columns, or bolted steel beams subject to Emaar and authority approval. |
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- No outside change: The work stays inside the villa.
- Fee: Emaar charges on the added GFA.
- Stairs and windows: We check access and how existing windows work with the new floor.
- Earlier works: Earlier extensions are part of the review.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan (independent villas)
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea against Emaar’s guide and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Arabian Ranches
Dubai Development Authority (DDA)
Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.
Is Arabian Ranches under DDA? →Structural Solutions
Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.
Arabian Ranches approval guide →Why applications come back
- Design does not follow Emaar’s guide
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Can I fill my double-height living room?
Yes, with structural approval before works start.
Does it count as GFA?
Yes, as added GFA.
Which structure is allowed?
Independent columns, or bolted steel beams subject to approval.
Who approves it?
Emaar issues the NOC, then DDA the permit.