Can I move my kitchen or bathroom in my apartment in Dubai?
Sometimes. To move a kitchen or bathroom in an apartment depends on the drainage routes and the slab. It needs a check by our engineers, the building management NOC and an authority permit.
Kitchens and bathrooms are connected to the building drainage through the slab, so moving them is limited by where the drains and shafts run. Our engineers check the slab, the drainage routes, the falls and the waterproofing before you plan. A raised floor can sometimes carry the new drain, but it adds load and height. The works need the building management NOC and an authority permit, with DCD approval where fire safety changes.

Official sites: Dubai Municipality · Dubai Development Authority · Dubai Land Department
Move a kitchen or bathroom: what you need to know
- Drainage: New drains must reach the building stacks with the right falls.
- Slab: No new openings in the slab without design and approval.
- Waterproofing: Wet areas over living spaces must be fully waterproofed.
- Neighbours below: Leaks into the apartment below are a common risk.
Documents you may need
- Title deed and owner ID
- Unit floor plan or as-built drawings
- Photos of the rooms
- Building management rules you received
- Tenancy contract and landlord NOC, if you are a tenant
Who does what
Step by step
We confirm the exact route for your property.
| Step | Approval route | Guides |
|---|---|---|
| Structural check Structural Solutions | Walls, slab and drainage checked before any design. | Wall checks |
| Drawings and calculations Structural Solutions | Layout drawings and stamped calculations where the structure is affected. | Structural calculations |
| Building management NOC Building management | NOC for the works in your unit. | Building management |
| Authority permit and DCD Approved consultant → authority and DCD | Apartment interior works need an authority permit; DCD where fire safety changes. | DCD approval |
| Completion Building management and authority | Final inspections; any fit-out deposit returned after clearance. | Final inspection |
Questions
More questions about move a kitchen or bathroom
Can I add a new bathroom?
Only where it can connect to the drainage; we check it first.
Can I core through the slab?
Only with a structural design and approval.
Does moving a kitchen need DCD?
Where fire safety changes, yes.
Who approves it?
Building management first, then the authority permit.
Related guides
