Building Management Final Inspection in Dubai
Send us the approved drawings and photos of the finished fit-out. We will prepare the completion pack and handle the inspections.
After a fit-out or apartment renovation, building management inspects the works against the NOC drawings before releasing the completion and any deposit. Missing as-built drawings and changes from the approved design are the usual comments.
Works finished?
Request your completion certificate online. Tell us what was done, upload your documents, and we initiate the sign-off with the relevant developer and authority on your behalf.
Request sign-off online →What the Inspectors Check
- Building management: the landlord, building management or mall inspects the fit-out before completion
- Built as approved: any change from the approved drawings must be approved or corrected before sign-off
- Deposit: where the developer took a refundable deposit, it is returned after clearance
- What Is Checked: Layout, services, fire safety and finishes in shared areas.
- How We Help: As-built drawings, the completion pack and attendance at the inspection.
Documents you will need
- Approved fit-out drawings and NOCs
- Photos of the finished fit-out
- Trade licence and tenancy contract
- Contractor details
- Any inspection comments received
How it works
How Fit-Out Sign-Off Works
01
Fit-Out Finished as Approved
02
As-Built Drawings and Owner Letter
03
Building Management Inspection
04
DCD Final Inspection
05
Authority Completion
06
Deposit Returned After Clearance
Who does what
Building Management Final Inspection in Dubai
Structural Solutions
As-built drawings, structural check where needed, and the completion pack; we coordinate the inspections.
Building management, landlord or mall
Final inspection of the fit-out against the approved drawings.
Dubai Civil Defence (DCD)
Final inspection of sprinklers, alarms, exits and other fire safety changes.
Authority (DDA, DM, Trakhees or DMCC via Concordia)
Completion certificate for the fit-out.
Building management or landlord
Fit-out deposit returned after clearance, where one was paid.
What Tenants Ask Us About Fit-Out Sign-Off
- Office
- Apartment
- Shop
- Services
- Fire Safety
- Deposit
What holds up sign-off
- Works differ from the approved drawings
- No as-built drawings
- Owner letter missing
- Inspection comments still open
Questions
Frequently asked questions
What does building management check?
The works against the approved NOC drawings.
What does fit-out sign-off mean?
The final inspections and the completion certificate for the fit-out.
Is DCD part of fit-out sign-off?
Yes, where fire safety systems were changed, which is the case in most fit-outs.
Is an owner letter needed?
Yes, an owner letter is required for completion.
When is the fit-out deposit returned?
Where one was paid, after clearance.