The Lakes · Emaar · Villa

Can I Make My Lakes Villa Look Modern?

Can I Make My Lakes Villa Look Modern? Often partly. Emaar reviews façade changes to keep the community’s look, so modern updates must fit its guidelines and need an Emaar NOC.

The short answer

Owners often want a more modern look: new cladding, larger windows, new railings, a new entrance or updated colours. Changes to the outside are reviewed by Emaar against the community’s look. Structural changes, such as bigger openings, also need stamped calculations and a Dubai Municipality permit. Inside, a full modern renovation is usually easier.

Developer NOCEmaar Community Portal
AuthorityDubai Municipality
PlansEmaar provides as-built plans
make my Lakes villa look modern

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the as-built plans, so the extension allowance is right.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in The Lakes
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Who does what

The approval route in The Lakes

The Lakes is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the as-built plans Emaar provides.—
Emaar NOC
Emaar Community Management
NOC through the Emaar Community Portal. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Municipality
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Municipality
Inspections during and after the works; the order can vary.—
Completion
Dubai Municipality
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in The Lakes

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Emaar as-built plans, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Municipality permit where the works are structural.

What each work needs in The Lakes

  • Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Municipality permit
  • Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first

Questions

Questions owners ask in The Lakes

Can I Make My Lakes Villa Look Modern?

Often partly. Emaar reviews façade changes, and modern updates must fit the community’s look.

Can I make the windows bigger?

Sometimes. Bigger openings need a structural check, an Emaar NOC and a Dubai Municipality permit.

Can I add cladding?

Emaar reviews materials and colours on the outside.

Can I renovate the inside to a modern style?

Usually, yes. Finishes need little approval; wall removal needs a structural check and the NOC.

Where do I start?

Send us photos and ideas; we check what Emaar is likely to accept.

Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA

Related guides

Keep reading