Open layouts, new kitchens and modern finishes are fine.
Can I Make My JGE Villa Look Modern?
Within limits. JGE requires a Mediterranean look, so the outside cannot become fully modern. Inside, you can modernise freely, and outside details can be refreshed within the style.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Outside
Pitched terracotta roofs and Mediterranean details stay.
How It Works in Jumeirah Golf Estates
01
Photos, Plot Details and Your Idea
02
Check Against the JGE Guidelines
03
Sketch and Early Feedback
04
wasl Concept and Detailed Design Review
05
Trakhees Building Permit
06
Works, Inspection and Completion
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Inside
What JGE Owners Ask Us About
Interior Makeover
Open Plan
New Kitchen
Exterior Refresh
Lighting
Windows
Can I Make My JGE Villa Look Modern
| Step | Who | What happens |
|---|---|---|
| 1 | You and our engineers | Your idea, photos and plot details. We get the as-built plans from wasl and check them against the villa. |
| 2 | wasl Urban Management (JGE NOC / DRC) | Reviews the concept design, then the detailed design, against the JGE Building Guidelines. We apply for you. |
| 3 | Trakhees | Building permit for structural works. |
| 4 | wasl and Trakhees | Inspections and completion. |
The JGE Rules That Matter Here
- Style: Mediterranean look with pitched terracotta roofs (pitch 4 to 12 in 12)
- Two design reviews: wasl reviews a concept design, then a detailed design, before the Trakhees permit
What to Send Us
- Title deed and owner ID
- Photos of the villa and the area to change
- As-built floor plans (wasl provides these from the Trakhees completion records)
- Your idea: a sketch is enough to start
- Drawings at 1:100 or larger for the wasl review (we prepare these)
JGE Guidelines
Checked first
wasl Review
Concept and detailed
Trakhees Permit
For structural works
Why JGE Owners Work With Us
We Know the JGE Rules
We check your idea against the JGE Building Guidelines before you spend money on full drawings.
wasl and Trakhees Handled
We prepare the drawings and handle the wasl Urban Management review and the Trakhees permit.
Engineers In-House
Structural checks, lift openings, mezzanines and extensions designed and stamped by our engineers.
Tell Us What You Want to Change
Send us photos, your plot details and your idea. We will tell you what is possible in JGE and handle the approvals.
Can I Make My JGE Villa Look Modern? FAQs
Can I change my JGE villa to a modern style?
Not fully outside; the Mediterranean look stays.
Who approves changes to my JGE villa?
wasl Urban Management (the JGE NOC / DRC team) reviews the design, then Trakhees issues the building permit.
Do I need full drawings to ask if my idea is possible?
No. A sketch and photos are often enough for an early indication before full drawings.
What rules does wasl check?
The JGE Building Guidelines: floor area, plot coverage, setbacks, height, building envelope and style.
Can you handle everything for me?
Yes. We check your idea, prepare drawings and calculations, and handle the wasl review and the Trakhees permit.
