Arabian Ranches · Emaar

Can I Make My Arabian Ranches Villa Look Modern?

Only partly. Emaar’s guide protects the villa’s architectural theme, so to make your Arabian Ranches villa look modern, the work is mostly inside, with limited changes outside.

Mostly on the inside. Emaar’s guide aims to keep the community’s visual harmony, so extensions must match the villa’s theme, materials, openings and colours. Front arches must be kept, front and first-floor windows cannot change, and textured walls stay as they are. Inside, you can change finishes, remove non-structural walls and open up the layout. At the side and rear on the ground floor, wider openings in non-structural walls can give a more modern feel.

InsideFree for finishes
OutsideMust match the villa
Rear and sideWider ground-floor openings

Emaar’s guide

Door and window rules in Arabian Ranches

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
Like for likeExisting doors can be replaced with the same specification and colour.
WideningGround floor only, in a non-structural wall. At least 0.3 m of blockwork stays at each end.
Door opening0.9 m at most.
Not allowedChanges to first-floor windows and ground-floor front windows.
AllowedGround-floor side and rear windows, in non-structural walls.
Two openingsTwo doors or windows split by a small non-structural wall can become one sliding door or window.
FinishSame material, colour and design as the villa.
TownhousesNew openings on side walls only, with enough setback. A sliding door can widen by at most 0.3 m each side.

Emaar’s guide

Internal works the guide allows

These are allowed if they do not affect the structure or waterproofing. From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
FinishesFloor tiles, sanitary ware, internal painting and ceilings.
JoineryKitchen and bathroom cabinets, and wardrobes.
BathroomBathtub to shower, or the reverse.
WallsRemoving non-structural internal walls.
ServicesMinor electrical and plumbing works.
Contractor accessContractors still need an Emaar entry permit to work in the community.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Facade changes: A full change of style is unlikely to fit the guide.
  • Front arches: Kept, as part of the villa’s design.
  • Pergolas: Wood finish in brown or white on villas.
  • Sliding doors: Two openings can become one, in non-structural walls.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Design does not follow Emaar’s guide
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Can I change the facade to a modern style?

The guide requires the architectural theme to be kept, so this is unlikely.

Can I add large glass doors?

At the ground-floor side or rear, in non-structural walls, within the opening rules.

Can I remove the front arches?

No, the arch profiles must be kept at the front.

Can I modernise inside?

Yes, finishes and non-structural walls are allowed.