Does a Balcony Closure Add to GFA in Dubai Hills?
Yes. Closing a balcony in Dubai Hills turns open space into enclosed space, so it adds GFA and Emaar charges on the added area.
The short answer
Yes. A closed balcony becomes enclosed floor area, so it adds GFA in Dubai Hills. Emaar charges per sq ft of added GFA: AED 1,000 up to 10%, then AED 3,000 to AED 6,000 above 10%, subject to Emaar Management approval. Townhouses are charged AED 1,000 per sq ft. We measure the balcony and your existing GFA from the as-built plans Emaar provides, so you know the added area before you apply. Emaar confirms the final amount when it reviews the application.
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Measured: From the as-built plans and on site.
- Earlier changes: Other additions are part of the review.
- Front balconies: Emaar reviews them case by case.
- Permit fee: The DDA permit fee is separate.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
Applied through the Emaar Community Portal.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Emaar
Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.
What is an Emaar NOC? →Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Does closing a balcony add GFA?
Yes, it becomes enclosed floor area.
How much does Emaar charge?
AED 1,000 per sq ft up to 10%, and higher rates above that, subject to Emaar Management approval.
Who measures it?
We measure from the as-built plans and on site, and Emaar confirms.
Are earlier additions included?
Yes, Emaar looks at the villa as a whole.