Can I Change My Boundary Wall or Gate in Dubai Hills?
Sometimes. Fences and gates stay no higher than the wall or 1.8 m, and rear and side changes are limited. It needs an Emaar NOC.
The short answer
Changes are limited. Rear and side walls can change only where your yard is exposed by higher ground or faces a guard house, with Emaar approval and a neighbour NOC. Fences and gates stay no higher than the existing wall or 1.8 m, whichever is less. A front fence on top of the existing wall can go up to 1.4 m or the pillar height, whichever is greater. Gates open inwards, and no new gate can go in the rear wall. All subject to Emaar’s review.
Emaar’s rules
Boundary wall, fence and gate rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Rear and side walls | Changes only where the yard is visible from common areas because of higher ground, or the wall faces a guard house. Needs Emaar approval and a neighbour NOC. |
| Height | Fence and gate no higher than the existing wall or 1.8 m, whichever is less. |
| Front fence | On top of the existing wall, up to 1.4 m or the front pillar height, whichever is greater. |
| Colours | Black, beige or dark brown, or dark timber. Simple designs only. |
| Gates | Open inwards and do not enter common areas. No new gate in the rear wall. |
| Privacy screening | Plants, or fencing with acrylic sheets. No other screening. |
| Townhouses | Rear changes only where higher common ground exposes the yard. Fences stay within the building line and no higher than the boundary wall. |
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Privacy: Plants, or fencing with acrylic sheets.
- Colours: Black, beige, dark brown or dark timber.
- Foundations: We check them before anything is added.
- Neighbours: A neighbour NOC may be needed.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
Applied through the Emaar Community Portal.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Emaar
Reviews the design through the Emaar Community Portal, issues the NOC and confirms its fees.
What is an Emaar NOC? →Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Can I raise my wall for privacy?
Only in limited cases, with Emaar approval and a neighbour NOC. Plants are the simple option.
Can I add a rear gate?
No, a new gate cannot go in the rear wall.
Which way can a gate open?
Inwards only.
What colours can I use?
Black, beige, dark brown or dark timber.