Quick answer
Built works in Dubai do not follow the same route as new works. An application for new works starts from a design. Works already built start from what is actually on site, so they go through an as-built route. The next steps depend on your community and the works, so contact us, and we will help you accordingly.
Last checked: November 2026. Official sources: Dubai Municipality ยท DDA ยท Trakhees
Many owners find out about an unapproved change when they plan new works, receive a notice or try to sell. Their first thought is to apply for a NOC as if the works had not started. For built works, that is not how it goes.
New works and built works compared
| New works | Built works | |
|---|---|---|
| Starts from | Proposed design | What is on site |
| Drawings | Proposed drawings | As-built drawings after a survey |
| Structure | Designed before building | Checked after building |
| Route | NOC, permit, works, completion | As-built route. Contact us for your case |
Why the first step is a survey
Nobody can advise on built works without knowing exactly what was built. We survey the works, check the structure and prepare as-built drawings. Our engineers can also prepare a structural report if you do not know what a contractor or previous owner did.
Can the works stay?
Contact us for more details. It depends on the works and your community, so we look at your case and advise you. The developer or authority may apply a fine, depending on the case.
What to send us
- Photos of the works
- Plot or villa number and community
- Any drawings, NOC or permit you have
- Any notice or letter you received
Can I apply for a NOC as if the works were new?
No. Built works go through an as-built route, not the route for new works.
Does this apply with Emaar and DAMAC?
Yes. See our pages on the Emaar NOC and DAMAC NOC for existing modifications.
Can I be fined?
The developer or authority may apply a fine, depending on the case.
Will the works have to be removed?
Contact us for more details. It depends on the works and your community.
Related service
Approval for existing modifications
We survey the works, check the structure, prepare as-built drawings and advise on your route.
Existing modification approval โAs-built approval โ