For structural works, we assess what was built and confirm whether strengthening is needed before approval.
As-Built Drawings for Regularisation Dubai
Regularising works that were built without approval starts with as-built drawings. They record exactly what exists so the developer and authority can review it, and so any structural assessment is based on fact.
We get your drawings for you
No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.
How to get your property drawings →Request online →WhatsApp us Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
The First Step in Regularisation
Whether it is an extension, enclosed balcony, removed wall or pergola, the authority needs to see what was built. Accurate as-built drawings are the basis for the retrospective NOC or permit.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Structural Assessment
Common Projects We Handle
Unapproved Extension
Enclosed Balcony
Removed Wall
Pergola or Shade
Service Block
Warehouse Mezzanine
As-Built Drawings for Regularisation Dubai at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys what was built, compares it with the approved drawings and prepares a structural assessment. |
| 2 | Master developer (where the community has one) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — Dubai Municipality, DDA or Trakhees — depending on the community | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Violation notice or VSR report (if any)
- Previously approved drawings, if available
- Photos of the unapproved works
Key Technical Rules
- Survey what is built: an as-built survey shows exactly what differs from the approved drawings.
- Structural assessment: unpermitted works are checked for safety before anything is submitted.
- Approve or remove: works that cannot be approved must be modified, removed or reinstated.
- Retrospective NOC and permit: approvable works go through the developer and the authority.
- Needed before sale: clearance is usually required before sale, handover or a VSR.
As-Built Survey
What is on site
Structural Check
Safety first
Retrospective NOC
Developer and authority
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
As-Built Drawings for Regularisation Dubai — FAQs
Why are as-built drawings needed for regularisation?
They show exactly what was built so it can be reviewed and approved.
Is a structural check needed?
For structural works, yes.
Who approves regularisation?
The developer and the permit authority for your area.
Can all works be regularised?
Many can; some may need changes.
Can you handle it?
Yes.
