Why the BUA on Your Title Deed Can Differ From the Actual Space
The title deed shows what was registered, not always what is built.
The built-up area (BUA) on a Dubai title deed reflects what was approved and registered. Rooms, enclosed balconies, converted garages or extensions added later usually do not appear on it unless they were approved and the records were updated. So the real built area can be larger than the title deed. When buying, extending or selling, we compare the title deed, the approved drawings and a site survey and tell you what is on record and what is not.

Official sources: Dubai Municipality · DDA
What we check
- Title deed: Registered BUA
- Drawings: Approved
- Site: Measured
- Additions: Since handover
- Records: Updated or not
- Next: Buy, extend or sell
Documents you will need
- Title deed or tenancy contract
- Owner or tenant ID
- Existing drawings, if available
- Photos and a short description
Route
How we compare the BUA
The general route. We confirm it for your project.
| Step | Approval route | Guides |
|---|---|---|
| Title deed You | The registered built-up area. | — |
| Approved drawings Developer or authority | What was approved. | — |
| Survey Our engineers | What is built today. | As-built survey |
| Comparison Our engineers | Differences listed. | — |
| Finding Structural Solutions | What is on record and what is not. | — |
| Next step You | As-built route or proceed. | — |
How it works
How we work
1. Send us the details
Property, area and what you need.
2. Check
Route and documents confirmed.
3. Site
Visit or survey if needed.
4. Design
Drawings and calculations by our engineers.
5. Submission
By us.
6. Follow-up
Comments until approval.
Related questions
What causes problems
- Buying on the title deed alone
- Additions never recorded
- Valuation surprises
Need help with this?
Get your route confirmed
Send us three things on WhatsApp:
- Property and area
- What you want to do
- Any drawings you have
Our engineers confirm the route, prepare the drawings and handle the submissions.
Questions
Questions
Why is my villa bigger than the title deed?
Later additions are usually not on it unless approved and recorded.
Does it matter when selling?
It can, with the buyer, the bank and the developer.
What if additions were never approved?
Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
