Balcony Closed Without Approval in Dubai: What to Do
Your balcony or terrace was closed with glass, aluminium or blockwork without a NOC or a permit. Built closures take an as-built route, not the new works route. We review the closure and help you from there.
A balcony that is already closed does not go through the new works NOC route. It takes an as-built route, and a fine may apply, depending on the case. A closed balcony usually adds floor area and changes the facade, so we review the closure, prepare the as-built drawings and the structural check, and advise you on the route for your case.
What we check
What we look at on a closed balcony
| Item | Why it matters |
|---|---|
| Frame and fixings | Loads on the slab and the parapet |
| Glass or blockwork | Weight on the balcony slab |
| Area added | Counts towards the floor area |
| Facade look | Checked against the community or building rules |
| AC and drainage | Shown on the drawings |
Related
Related guides
| Topic | Guide |
|---|---|
| Closing a balcony (new works) | Balcony enclosure NOC |
| Structural report | Structural report for built works |
| Developer notice | Violation notice for built works |
Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence
What you need to know
- Built closures take the as-built route.
- Slab and parapet are checked for the new loads.
- A fine may apply, depending on the case.
- Apartments also involve the building management.
Documents you will need
- Title deed
- Photos inside and outside the balcony
- Any supplier drawings of the frame
- Any notice from the developer or building
How it works
How we help with a closed balcony
1. Tell us
Villa or apartment.
2. Site visit
We see what was built.
3. Survey
Measured on site.
4. Drawings
As-built drawings.
5. Structure
Report if needed.
6. Advice
The route for your case.
Already done
What to do now
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Closed balcony questions
Does it follow the normal NOC route?
No. Built works take an as-built route, not the new works route. Contact us and we will help you accordingly.
Will I get a fine?
The developer or the authority may apply a fine, depending on the case. We cannot say more until we review your case.
Is a closed balcony a structural issue?
It can add load to the slab and the parapet. We check it and include it in the structural report.
I live in an apartment. Is it the same?
Built works still take the as-built route, and the building management is involved. Contact us and we will check your case.
Who can help?
Structural Solutions reviews what was built, surveys the site, prepares the as-built drawings and the structural report, and advises you on the route for your case. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.