Food business · Bakery and Patisserie

Bakery and Patisserie Approval in Dubai

Opening or fitting out a bakery and patisserie in Dubai? Here is the approval route.

A bakery and patisserie follows the same route as other food businesses: Dubai Municipality food layout approval, the fit-out permit from the authority for the area and Civil Defence approval, then an inspection before opening. Ovens and their exhaust are part of the drawings and the Civil Defence review. We prepare the drawings and submit them.

What we prepare

  • Layout: Scaled plan of the unit
  • Equipment: Positions and list
  • Process flow: Receiving to service
  • Zones: Storage, preparation, washing
  • Finishes: Walls, floors, ceilings
  • Services: Drainage, exhaust, grease trap

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or title deed
  • Landlord, building or mall NOC (or we request it with you)
  • Your activity, menu and equipment list
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your unit and area.

StepApproval routeGuides
Drawings
Structural Solutions
Food layout drawings: the layout, equipment and how food moves through the unit.Documents and drawings
NOC
Landlord, building or mall
Approval of the works. In communities the developer approves first; in malls, the mall management.—
DM Food Safety
Dubai Municipality
Food layout approval, submitted by us. It applies in DDA, Trakhees, DSO and DMCC areas too.—
Fit-out permit
Authority for the area
DM, DDA, Trakhees, DSO or DMCC, depending on where the unit is.Fit-out permit
Civil Defence
DCD
Fire and life safety approval for the fit-out.DCD for food outlets
Inspection
Dubai Municipality
Inspection before opening. Then the food safety remark on the trade licence is removed.Trade licence remark

How it works

How we get it approved

1. Send us the details

Area, unit, business and what you serve.

2. Site check

We measure the unit and check the services.

3. Drawings

Food layout and fit-out drawings.

4. Submission

DM Food Safety, the area authority and DCD, by us.

5. Comments

We answer them until approval.

6. Inspection

Before opening, then the licence remark is removed.

What causes problems

  • Equipment not shown on the layout
  • Starting works before approval
  • Changing the layout after approval

Opening a food business?

Get your food layout approved

Send us three things on WhatsApp:

  1. Area, building and unit
  2. Your activity and menu
  3. Photos or existing drawings

We prepare the drawings and handle DM Food Safety, the fit-out permit and DCD.

Questions

Questions

Is the route different from a restaurant?

No, the same route applies.

Who submits it?

We do.

Do ovens need DCD review?

Ovens and exhaust are part of the fire and life safety drawings.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading