Drawings · AutoCAD

AutoCAD Drafting Services in Dubai

Drawings that developers, authorities and malls accept, drafted with engineers behind them.

We draft in AutoCAD for villas, apartments, shops, offices and warehouses in Dubai: as-built drawings, existing and proposed layouts, permit drawings, fit-out drawings, DLTM plot drawings and PDF-to-CAD conversions. Because our drafters work with our engineers, the drawings follow the format the developer, authority, mall or building management asks for and can be reviewed and stamped for submission.

AutoCAD Drafting Services in Dubai

Official sources: Dubai Municipality · DDA

What we check

  • Plans: Floor plans and layouts
  • Elevations: And sections
  • Site: Site and DLTM plans
  • Structure: Structural drawings
  • Format: Developer or authority
  • Files: DWG and PDF

Documents you will need

  • Title deed or tenancy contract
  • Owner or tenant ID
  • Existing drawings, if available
  • Photos and a short description

Route

How we prepare your drawings

The general route. We confirm it for your project.

StepApproval routeGuides
Brief
You
What you need and what you have.—
Site visit
Our engineers
Where measurements are needed.As-built survey
Drafting
Structural Solutions
AutoCAD drawings to the required format.—
Engineer review
Our engineers
Checked before issue.—
Revisions
Structural Solutions
Until you are happy.—
Issue
You
DWG and PDF.—

How it works

How we work

1. Send us the details

Property, area and what you need.

2. Check

Route and documents confirmed.

3. Site

Visit or survey if needed.

4. Design

Drawings and calculations by our engineers.

5. Submission

By us.

6. Follow-up

Comments until approval.

What causes problems

  • Wrong drawing format
  • Drawings not matching site
  • No engineer review

Need help with this?

Get your route confirmed

Send us three things on WhatsApp:

  1. Property and area
  2. What you want to do
  3. Any drawings you have

Our engineers confirm the route, prepare the drawings and handle the submissions.

Questions

Questions

Can you convert PDF drawings to CAD?

Yes.

Do you draft in authority format?

Yes: DM, DDA, Trakhees, developers, malls and building management.

Can the drawings be stamped?

Yes, after engineer review, where the submission needs it.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading