Building Permit Record Check in Dubai
Before you buy, take over a project or restart works: what does the authority have on file?
A building permit record check confirms what the authority has on file for a property or project: whether a permit is active, expired or closed, the contractor and consultant on record, the approved scope and the drawings. It is useful before buying, before taking over a project, when a contractor leaves, or when works restart. As your consultant we request the records and tell you what they mean.

Official sources: Dubai Municipality · DDA
What we check
- Status: Active, expired or closed
- Contractor: On record
- Consultant: On record
- Scope: Approved works
- Drawings: On file
- Completion: Certificate or not
Documents you will need
- Title deed or tenancy contract
- Owner or tenant ID
- Existing drawings, if available
- Photos and a short description
Route
How a record check works
The general route. We confirm it for your project.
| Step | Approval route | Guides |
|---|---|---|
| Permit number or plot You | Whatever you have. | — |
| Record request Structural Solutions | From the authority, as your consultant. | — |
| Review Our engineers | Status, contractor, scope and drawings. | — |
| Site comparison Our engineers | If needed: built against approved. | — |
| Findings Structural Solutions | What it means and next steps. | — |
| Next step You | Renew, change contractor, as-built route or proceed. | — |
How it works
How we work
1. Send us the details
Property, area and what you need.
2. Check
Route and documents confirmed.
3. Site
Visit or survey if needed.
4. Design
Drawings and calculations by our engineers.
5. Submission
By us.
6. Follow-up
Comments until approval.
Related questions
- Expired building permit
- DM building card
- Pre-purchase villa check
What causes problems
- Buying without checking
- Old contractor still on record
- Works beyond the approved scope
Need help with this?
Get your route confirmed
Send us three things on WhatsApp:
- Property and area
- What you want to do
- Any drawings you have
Our engineers confirm the route, prepare the drawings and handle the submissions.
Questions
Questions
Can I check a permit before buying?
Yes. We request the records as your consultant.
What if the permit expired?
It can usually be renewed or revalidated; it depends on the case.
What if works differ from the permit?
Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
