For renovation applications we prepare the existing as-built layout and the proposed layout side by side, the format most building managements expect.
Apartment As-Built Drawings Dubai
We prepare as-built drawings for apartments in Dubai — for renovation applications, building management submissions, layout changes and sales.
We get your drawings for you
No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.
How to get your property drawings →Request online →WhatsApp us Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
When Apartments Need As-Built Drawings
Building management and developers often ask for existing-layout drawings before approving renovations. They are also useful when buying or selling a modified apartment.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Existing and Proposed
Common Projects We Handle
Renovation Application
Kitchen Layout Change
Wall Removal
Sale or Purchase
Missing Floor Plans
Tenant Fit-Out
Apartment As-Built Drawings Dubai at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Reviews the unit, prepares the drawings and checks any structural element affected. |
| 2 | Building management or owners association | Issues the NOC for the works. |
| 3 | Authority — Dubai Municipality, DDA or Trakhees — depending on the community | Reviews the drawings and issues the permit. |
| 4 | Landlord and authority | Completion inspection. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC)
- Owner passport and Emirates ID copy
- Building management or owners association NOC form
- Unit floor plan
- Contractor documents
Key Technical Rules
- Building NOC first: the building management or owners association approves the works.
- Structure untouched without a check: columns, beams and structural walls are never altered without an engineer.
- Balcony and facade changes: usually need developer approval.
- Wet areas: waterproofing and drainage are protected during the works.
- Authority permit: for structural or major works.
Building NOC
First approval
Structural Check
Before changes
Authority Permit
Major works
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
Apartment As-Built Drawings Dubai — FAQs
Do apartments need as-built drawings?
Often yes, for renovation approvals or when floor plans are missing.
Who asks for them?
Building management, developers and buyers.
Do you show existing and proposed layouts?
Yes.
Do you visit the apartment?
Yes, to measure on site.
Can you help with the renovation NOC?
Yes.
